This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Flexential Portland - Hillsboro 6.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Flexential
- Address and locality
- 3935 NE Aloclek Place · Hillsboro · Washington County · Oregon
- Official metro area
- Portland-Vancouver-Hillsboro, OR-WA
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 27 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000666
What the source record says
Planned sixth Flexential building in Hillsboro: 350,000 sq ft, two storeys, 27 MW. Coordinates are a street-level approximation of NE Aloclek Place; the exact parcel has not been geocoded. Local reporting places the project inside the City of Hillsboro's 120-day data-center land-use moratorium adopted 27 July 2026. Public-reception check (2026-09-10): Checked the operator's own acquisition press release (2026-09-10); it covers only market positioning, infrastructure advantages, and financial backing. No community reaction, hearing, or official statement of support/opposition documented in this source.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-09 · source-reported proposed
Flexential announced the acquisition of the 3935 NE Aloclek Place property, across from its Hillsboro 1 data center, for a planned 350,000 sq ft two-storey, 27 MW facility.
Sources and attribution
- Flexential Acquires Prime Property in Hillsboro, Plans New Data Center as Next Phase of Expansion · Flexential via PR Newswire
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID flexential-portland-hillsboro-6-or. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000666
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 3935 NE Aloclek Place, Hillsboro, OR · Washington (Approximate location)
Roles
- Operator: Flexential
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2025-09 · source-reported proposed
Status history supplied by the source.
Power capacity
- Reported capacity: Planned: 27 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-10
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.