Licensed lead · not independently verified · dcd-dir-000550

Edged Chicago Campus — Aurora (ORD01)

source-reported under construction

Edged US

Aurora · DuPage County · Illinois

Reported planned 72 MWSource updated 23 July 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Edged Chicago Campus — Aurora (ORD01).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Edged US
Address and locality
Aurora · DuPage County · Illinois
Official metro area
Chicago-Naperville-Elgin, IL-IN
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 72 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
23 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000550
Dated source review

The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.

  • status: Provider status: under construction. The operator says the first building on this campus opened in February 2025; the second building is scheduled for Q2 2027. The status describes the expansion, not the whole campus.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
ComEdUtility as named by the provider.
Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
November 2025Provider-reported announcement date.

Provider notes

Energy. Grid-connected; proprietary waterless cooling eliminates cooling-related energy overhead

Water. ThermalWorks liquid-to-chip cooling exceeding 200 kW per rack; zero water consumption for cooling; saves 277M+ gallons annually vs conventional data centers

Community. Aurora officials approved the Edged campus (rezoning + preliminary plan) and the state EDC lists it as an economic-development win, but city-wide data-center concern led Aurora to pass some of Illinois's strongest data-center regulations in March 2026 (sound limits, resource-consumption reporting, mandatory council approval, a prior moratorium). No Edged-specific organized opposition identified.

What the source record says

Address: 2835 Bilter Rd, Aurora IL (DuPage County). Total campus planned at 96 MW across three buildings. Explicitly purpose-built for high-density AI workloads. Coordinates approximate for Bilter Rd area of north Aurora; address confirmed in operator press release. A confirmed capex figure of ~$300M covers the first building (ORD01-1) only, not the ~96 MW three-building campus; construction-workforce figures (~2,000 full campus) are projections. No Illinois DCEO data-center exemption certification was found for Edged.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-02 · source-reported operational

    First 24 MW building (ORD01-1) opened February 27, 2025

    Open cited source →

  2. 2025-11 · source-reported under construction

    Groundbreaking for second AI-focused building November 2025; scheduled for Q2 2027 operational status

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID edged-aurora-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row is retained from 1.33.0+git-e97215faac76, source as of 2026-09-25T23:45:52.227Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000550

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Aurora, IL · DuPage (Approximate location)

Roles

  • Operator: Edged US

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: November 2025

    Provider-reported announcement date.

  • Status history: 2025-02 · source-reported operational

    Status history supplied by the source.

  • Status history: 2025-11 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 72 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: ComEd

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-23

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →