Licensed lead · not independently verified · dcd-dir-000366

CyrusOne Dugway Proving Ground Data Center

source-reported proposed

CyrusOne

Tooele County · Utah

Capacity not statedSource updated 24 July 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for CyrusOne Dugway Proving Ground Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
CyrusOne
Address and locality
Tooele County · Utah
Official metro area
Salt Lake City-Murray, UT
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not stated
Source freshness
24 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000366

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
PacifiCorpUtility as named by the provider.
Power source
GridProvider label.
Land area
1,201 acres (source-reported; parcel boundary not established)
Announced investment
$2 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.

What the source record says

Conditionally selected, currently in exclusive negotiations with the US Army (not finalized); expected completion ~2029. Would be CyrusOne's first Utah facility, developed in partnership with Carlyle. Framed as AI-driven Army infrastructure ('AI is a strategic asset... force multiplier' per the Army Secretary) rather than marketed as a standalone AI-brand product. Coordinates are approximate. In exclusive negotiations with the US Army as of the cited source. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. — structural, not merely unresearched: Dugway Proving Ground is U.S. Army-owned federal land in unincorporated Tooele County, which sits outside any county/municipal property-tax roll, so a Title 17C Community Reinvestment Agency increment or abatement is not possible here regardless of county policy. Any public-sector instrument would be a federal Army real-estate arrangement, not a local or state subsidy, and the site remains in exclusive negotiations, not a finalized agreement. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cyrusone-dugway-proving-ground-tooele-county-ut. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000366

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • UT · Tooele (Approximate location)

Roles

  • Operator: CyrusOne

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

Area, acreage and buildings

  • Land area: 1,201 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: PacifiCorp

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $2 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-24

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →