This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for CyrusOne Wood Dale Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- CyrusOne
- Address and locality
- Bryn Mawr Avenue · Wood Dale · DuPage County · Illinois
- Official metro area
- Chicago-Naperville-Elgin, IL-IN
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 18 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 15 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000361
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Announced jobs
- 20 permanent
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Illinois Data Center Investment Program (sales/use tax exemption MOU) · Illinois · 2024 · $15.625 million (as stated) Open cited source →
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Announced investment: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
What the source record says
Operator states "the campus will include two buildings totaling more than 500,000 square feet, delivering an initial IT capacity of 18 megawatts with scalable capacity" — the 18MW is the initial IT capacity, not a full-build figure. Street-level coordinate is approximate: the press release names only Wood Dale, and the Bryn Mawr Avenue location comes from secondary reporting. Distinct from the tracked CyrusOne Aurora (CHI1–CHI3) and CyrusOne Sangamon County records.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-05-13 · source-reported under construction
Topping-out ceremony marking completion of the structural framework; facility still under construction.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- CyrusOne Celebrates Wood Dale Topping Out Ceremony · CyrusOne
- Data Center Investment Program 2025 Annual Report (C1 Chicago 1 LLC - C1 Chicago 2 LLC, Wood Dale, 2024 MOU) · Illinois Department of Commerce and Economic Opportunity
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cyrusone-chi6-wood-dale-il. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000361
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Bryn Mawr Avenue, Wood Dale, IL · DuPage (Approximate location)
Roles
- Operator: CyrusOne
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2025-05-13 · source-reported under construction
Status history supplied by the source.
Power capacity
- Reported capacity: Planned: 18 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Announced jobs: 20 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Incentive reported by the source: Illinois Data Center Investment Program (sales/use tax exemption MOU) · Illinois · 2024 · $15.625 million (as stated)
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-15
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.