Licensed lead · not independently verified · dcd-dir-000261

Project Cherry Blossom

source-reported proposed

Cloverleaf Infrastructure

Frenchtown Township · Monroe County · Michigan

Capacity not statedSource updated 9 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Project Cherry Blossom.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Cloverleaf Infrastructure
Address and locality
Frenchtown Township · Monroe County · Michigan
Official metro area
Monroe, MI
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not stated
Source freshness
9 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000261

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
DTE EnergyUtility as named by the provider.
Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Land area
200 acres (source-reported; parcel boundary not established)
Announced investment
$1 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
100 permanent · 1,500 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment.

Provider notes

Water. Developer FAQ: closed-loop cooling requiring a one-time fill; daily use described as comparable to a typical office building.

Community. Cloverleaf held a public informational meeting with Frenchtown Township; broader community reception not independently confirmed this session.

What the source record says

Proposed on the former ProMedica Hospital site off I-75 and North Dixie Highway, Frenchtown Township; site is zoned Planned Unit Development, allowing industrial use. ~200 acres; preliminary plans include a pedestrian/bike path and landscaped berms/tree buffers along North Dixie Highway. Cloverleaf's own FAQ describes it as still 'in the development phase' with a taxable investment of 'more than $1B' but does not disclose a MW capacity figure. Cloverleaf is already tracked elsewhere (MO, OK) as a data-center developer. Note: Cloverleaf's own FAQ page refers to the project once as 'Project Ironwood' -- unclear whether this is the same project under an earlier working name or a distinct nearby Cloverleaf site (a 'Project Ironwood' near Dundee/Milan Townships in the same county has been reported separately elsewhere); treated as one record here pending disambiguation in a future pass. Coordinates are an approximate Frenchtown Township / former-hospital-site estimate, not parcel-geocoded. Confirmed absence for capacityMw: the developer states publicly that the site's available power has not yet been determined, so no MW figure exists to record rather than one being missed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cloverleaf-cherry-blossom-frenchtown-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000261

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Frenchtown Township, MI · Monroe (Approximate location)

Roles

  • Operator: Cloverleaf Infrastructure

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

Area, acreage and buildings

  • Land area: 200 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: DTE Energy

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $1 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 100 permanent · 1,500 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-09

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →