This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Project Cherry Blossom.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Cloverleaf Infrastructure
- Address and locality
- Frenchtown Township · Monroe County · Michigan
- Official metro area
- Monroe, MI
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 9 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000261
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- DTE Energy
- Power source
- Grid
- Cooling
- Closed-loop
- Land area
- 200 acres (source-reported; parcel boundary not established)
- Announced investment
- $1 billion
- Announced jobs
- 100 permanent · 1,500 construction
- Community response
- Provider label: mixed
Provider notes
Water. Developer FAQ: closed-loop cooling requiring a one-time fill; daily use described as comparable to a typical office building.
Community. Cloverleaf held a public informational meeting with Frenchtown Township; broader community reception not independently confirmed this session.
What the source record says
Proposed on the former ProMedica Hospital site off I-75 and North Dixie Highway, Frenchtown Township; site is zoned Planned Unit Development, allowing industrial use. ~200 acres; preliminary plans include a pedestrian/bike path and landscaped berms/tree buffers along North Dixie Highway. Cloverleaf's own FAQ describes it as still 'in the development phase' with a taxable investment of 'more than $1B' but does not disclose a MW capacity figure. Cloverleaf is already tracked elsewhere (MO, OK) as a data-center developer. Note: Cloverleaf's own FAQ page refers to the project once as 'Project Ironwood' -- unclear whether this is the same project under an earlier working name or a distinct nearby Cloverleaf site (a 'Project Ironwood' near Dundee/Milan Townships in the same county has been reported separately elsewhere); treated as one record here pending disambiguation in a future pass. Coordinates are an approximate Frenchtown Township / former-hospital-site estimate, not parcel-geocoded. Confirmed absence for capacityMw: the developer states publicly that the site's available power has not yet been determined, so no MW figure exists to record rather than one being missed.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- FAQs - Project Cherry Blossom · Cloverleaf Infrastructure
- Project Cherry Blossom - home · Cloverleaf Infrastructure
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cloverleaf-cherry-blossom-frenchtown-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000261
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Frenchtown Township, MI · Monroe (Approximate location)
Roles
- Operator: Cloverleaf Infrastructure
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
Area, acreage and buildings
- Land area: 200 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: DTE Energy
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $1 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 100 permanent · 1,500 construction
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Community response: Provider label: mixed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-09
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.