This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for CloudBurst Oklahoma City Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- CloudBurst Data Centers
- Address and locality
- Oklahoma City · Oklahoma County · Oklahoma
- Official metro area
- Oklahoma City, OK
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000253
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- Grid
- AI-use label (provider)
- likely
Provider notes
Energy. Developer markets the campus as 'behind-the-meter' power infrastructure with N+1 redundancy.
What the source record says
200 MW IT load across a planned multi-building campus reported near 2000 S Council Rd. Coordinates are an Oklahoma City centroid approximation. Oklahoma City's 2026 data-center moratorium is reported to have affected the timeline.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-08 · source-reported proposed
Developer's site shows a Q4 2025 groundbreaking target with 30 MW revenue-generating service in Q4 2026; still pre-construction as of retrieval.
- 2026-09-14 · source-reported under construction
News 9 reports the campus "broke ground at the end of 2025" and is under development on a three-phase schedule: Phase 1 delivering 30 MW at the end of 2026, Phase 2 delivering 50 MW around mid-2027, and Phase 3 completing at the end of 2028 for the full 200 MW across three data centers. This moves the record past 'proposed'.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- CloudBurst Data Centers — Oklahoma City campus · CloudBurst Data Centers
- What data centers are being built in Oklahoma? · News On 6
- What to know about OKC CloudBurst data center campus · News 9 (KWTV)
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID cloudburst-oklahoma-city-campus-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
Operator’s own listing
What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.
- Name as listed
- Oklahoma City Campus
- Address as published
- Oklahoma City, OK
Lifecycle status is not published for this listing.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000253
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Oklahoma City, OK (Approximate location)
Roles
- Operator: CloudBurst Data Centers
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2026-08 · source-reported proposed
Status history supplied by the source.
- Status history: 2026-09-14 · source-reported under construction
Status history supplied by the source.
Power capacity
- Reported capacity: Planned: 200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: Grid
Provider label.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.