Project Blue

source-reported under construction

Beale Infrastructure

Pima County · Arizona

Planned 600 MWSource updated 10 September 2026exact location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Project Blue.

Exact source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Beale Infrastructure
Address and locality
Pima County · Arizona
Source-reported status
under construction
Facility type
data center
Reported capacity
Planned: 600 MW (source-reported; boundary not independently verified)
Source freshness
10 September 2026
Location precision
exact
Source confidence
confirmed
Stable directory ID
dcd-dir-000177

What the source record says

Unincorporated Pima County, west of Houghton Rd, near Tucson. 500-700MW planned across 13M sq ft (a range, so omitted from capacityMw). AWS confirmed as end-customer via an NDA obtained by AZ Luminaria. Distinct site from Beale Infrastructure's Fremont Peak Properties/Luckett Road project in the Town of Marana (also AZ, also tracked this session) - same developer family, different parcel. Coordinates are approximate. The 180 permanent jobs figure is a projection for the third year of operations in 2029, published by Pima County and by the developer. Beale's own letter of 2025-09-17 adds a qualifier the county FAQ omits: the figure "include[s] full-time contractors and support personnel", and at least 75 of the roles will be directly employed by the end user. Beale has also stated it "is not asking for property tax incentives, often a necessary component of a data center project's cost competitiveness", and the utility agreement with Tucson Electric Power carries no financial incentives or discounts — unusual for a project of this size, and the reason subsidies are recorded as absent rather than merely unsearched.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-04 · source-reported under construction

    Land clearing/grading began April 24, 2026, after county-level revival following the Tucson City Council's 2025 annexation rejection.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID beale-project-blue-pima-county-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.