Exact operator label · licensed discovery layer

PRSM Group data centers: 2 listings with status and map

2 listings from a licensed directory under the exact operator label “PRSM Group”, with location and stated status. Names are not merged into parent companies or ownership groups.

2 licensed rows2 states1 localities1 source-reported cancelled1 source-reported proposedLicensed edition dated 14 October 2026

Discovery boundary: operator names are exact published strings and are not resolved corporate identities. Rows have not been independently verified by DataCenterData.

Reported geography

2 reported PRSM Group facility points.

Points belong only to rows carrying the exact published operator label “PRSM Group”. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Showing 1–2 of 2 rows.

  1. source-reported proposedReported planned 225 MWSource updated 10 September 2026approximate location
  2. source-reported cancelledCapacity not statedSource updated 27 August 2026approximate location
Source and reuse

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).