Wisconsin index · last changed 16 September 2026

Wisconsin data centers: what the public record shows.

Selected source-linked records are published below. This is not a complete inventory of Wisconsin data centers.

18 sourced policy records for Wisconsin ↓Facility register: 40 records · by county →1 published DataCenterData record · evidence status shown per row37 licensed directory leads · not independently verifiedThese counts overlap and are not added together

Explore Wisconsin

Map, listings and checked facts.

Start with 37 licensed source leads, then inspect the separate public-evidence layer below. Licensed rows are not independently verified and are not a statewide census.

Wisconsin map

Reported locations in Wisconsin

37 licensed rows · 27 source localities · 4 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 49 data-center source listings here across licensed, operator and DataCenterData layers (37 with a map point); 49 with government registry records. Source listings are not distinct sites.
Browse 4 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

37 licensed rows27 reported city labels28 eligible organization labels

Browse all 37 rows below. Licensed rows are not independently verified and remain separate from the checked public-evidence layer.

  1. source-reported proposedReported planned 800 MWSource updated 18 August 2026approximate location
  2. source-reported operationalReported planned 20 MWSource updated 26 July 2026exact location (provider label)

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

2 operator-listed sites (mixed units; not added to licensed rows) in Wisconsin →

2 of these sites have no supported coordinate. The map does not invent a pin or a metro placement for them.

Wisconsin evidence at a glance

A few checked sites

Selected public evidence, not a statewide census. Each row shows whether it is independently source-linked, attributed, or unresolved; licensed leads remain separate.

Published project / campus
1
Published facility / building
0
Attributed or unresolved rows
0
Licensed directory leads
37 not independently verified
Capacity boundary stated
0 of 1 published DataCenterData rows
Review timing
Audit through 11 September 2026 · next 12 March 2027
Known coverage gap

WEDC certification letters, application files and any award amounts were not located.

Browse all 37 Wisconsin licensed leads → · Why these counts differ →

Campuses

1 campus record. Names are as they appear on each record page.

Campuses published for Wisconsin
Record / rolesStatusCapacity / scalePrimary evidence
Vantage Lighthouse CampusDeveloper: Vantage Data Centers constructioncampus UnknownNo independently supported figure Port Washington Data Center Proposal →Gov. record

Where the records were checked

Statewide audit pending

A few checked sites

This is not a list of every data center in the state, and the number here is not a count of them. There are almost certainly more.

Statewide coverage is not complete. The records below are sourced; a full statewide count has not been published.

State research audit window ended 11 September 2026. Individual records and claims below show their own evidence dates and may be newer.

Next scheduled coverage review: 12 March 2027.

1 independently source-linked project/campus record; 0 independently source-linked facility/building records; 0 attributed or unresolved rows. These counts use different units and must not be added together.

Source families checked, selected records and remaining gaps

These notes name selected records, say which kinds of public evidence were checked and show what remains missing. They do not add anything to the published counts.

Local evidence by place

Licensed and operator listings, reviewed records, answers and local policy for each place. Listings overlap and are not added; a place without a line here has no published local evidence.

No local evidence answer, reviewed record or local policy record is published for Appleton, Beaver Dam, Beloit, Caledonia, Carlton, Cassville, DeForest, Franklin, Janesville, Wisconsin Rapids. Their listings above are source listings to investigate. No statewide evidence answer is published for Wisconsin either; statewide rules are under Policy tracker below.

Policy tracker

Wisconsin policy records

18 sourced records are associated with this state context. They are grouped below as current, pending and nonbinding, and history, and each card shows its relevant date. These are not facility counts and do not cover every locality.

Current 7 records

Recorded as in effect on the dataset date. This does not mean every project in a represented state is restricted or approved.

Incentive or explicitly supportive policy

2025 Wisconsin Act 16: data center tax incremental district exception

In effect · Wisconsin · State

Effective: 10 July 2025

Issuing authority: Wisconsin Legislature

2025 Wisconsin Act 16, enacted on 8 July 2025 and effective on 10 July 2025, exempts a tax incremental district that contains a certified qualified data center, and whose project costs all relate to that data center, from the 12 percent limit findings requirement for tax incremental districts.

Read the sourced record · Primary source

Incentive or explicitly supportive policy

Qualified data center sales and use tax exemption (Wis. Stat. 77.54(70))

In effect · Wisconsin · State

Effective: 1 October 2023

Issuing authority: Wisconsin Legislature

Wisconsin exempts property, including electricity, used exclusively to build or operate a qualified data center, and used solely there, from sales and use tax under section 77.54(70) of the Wisconsin Statutes; the exemption also covers dedicated water cooling or conservation systems and contractor purchases that become part of the data center.

Read the sourced record · Primary source

Pending or nonbinding 3 records

Adopted measures with unverified effect, adopted future measures, open proceedings, proposals, drafts and nonbinding context stay separate from current rules.

Legislation introduced (any outcome) · Milwaukee only (local rule)

Milwaukee: proposed data center zoning standards (File 260142)

Proposed · City of Milwaukee, Wisconsin · Local

Last checked: 3 November 2026

Issuing authority: Milwaukee Common Council

A substitute ordinance before the Milwaukee Common Council, File 260142, would add data centers to the zoning code as a new land use, allow them only in light and heavy industrial districts, and set size tiers: a limited use up to 20,000 square feet, a special use from 20,000 to 60,000 square feet, and no data centers above 60,000 square feet.

Read the sourced record · Primary source

History 8 records

Expired, repealed, vetoed, failed, blocked, superseded and completed measures remain visible without being presented as current.

Legislation introduced (any outcome)

Senate Bill 729 (2025) on large energy customers and data centers (did not pass)

Did not pass · Wisconsin · State

Ended: 23 March 2026

Issuing authority: Wisconsin Legislature

Wisconsin Senate Bill 729 of the 2025-2026 session, the companion of Assembly Bill 722, combined large energy customer fees and a very large customer utility class with building requirements for data centers and a required pay rate on large-scale data center projects.

Read the sourced record · Primary source

Open the Wisconsin policy comparison

Review dates: the 18 Wisconsin records were last checked 22 September 2026 to 3 November 2026. 6 scheduled reviews are overdue as of the tracker date 3 November 2026: 2025 Wisconsin Act 16: data center tax incremental district exception, Department of Revenue guidance on the qualified data center exemption (Fact Sheet 2114), Qualified data center certification by WEDC (Wis. Stat. 238.40), Wood County: notice requirement for large-scale data center projects (Ord. #709) (last checked 23 September 2026, review due 23 October 2026); Qualified data center sales and use tax exemption (Wis. Stat. 77.54(70)) (last checked 22 September 2026, review due 22 October 2026); Dane County: 18-month pause on hyperscale data center zoning permits (last checked 2 October 2026, review due 30 October 2026). Overdue means not re-read yet, not changed. No single record, and not this list, establishes complete statewide policy coverage.