STAK Energy Campus

Lifecycle label: proposed; effective date not established Status evidence: Alaska DNR ADL 422741 preliminary state-land decision dated 2026-05-12 Evidence: Independently source-linked Reuse: Reference only

Facts at a glance

Record ID
stak-energy-campus-north-slope-ak
Record type
campus
Developer
STAK Energy Corporation
Operator
Not named in the cited records
Owner
Owner of record not established
Tenant
Not named in the cited records
Capacity
upper end of stated 1–3 GW design range 3 GW onsite generation planned · campus scope
DNR describes a planned onsite natural-gas generation system designed for 1–3 GW and a behind-the-meter configuration in which the HPC facility would consume generated electricity onsite. 3,000 MW is only the upper end of that planned generation-design range. It is not critical-IT capacity, utility-request or approved-service capacity, measured or current load, grid export, built generation, permitted generation, or an aggregation input.
Location
North Slope Borough, AK
approximate — Approximate proposed-site bounds from DNR's PLSS description and four approximate corner coordinates: approximately one mile west of Dalton Highway Milepost 390 and approximately 26 miles south of Deadhorse. This is not asserted as a surveyed or perfected lease boundary. No street address, city, centroid or third-party coordinate is published.
Physical scale
Physical scale: The proposed state surface-lease area is approximately 715.4 acres. DNR describes an approximately 640-acre principal gravel pad and a planned 1.8-mile gravel access road within the project description. These are proposed lease, pad and road figures, not developed acreage, data-hall area, floor area, building count, commissioned scale, or capacity.

What the sources support

Alaska DNR's Preliminary Decision says STAK Energy Corporation applied for a 50-year state-land lease and that the Division proposes to issue a negotiated lease for a commercial natural-gas-powered data-center/HPC campus. The decision is a preliminary best-interest finding that proceeded to public notice; a later official notice extended comments through July 17, 2026. DNR expressly says this is one component of a broader permitting process, that the final finding, entry authorization, perfected lease, pipeline right-of-way, air, water, wetlands and other approvals are separate, and that plan updates require written approval before construction. No selected record establishes the final finding, entry authorization, executed lease, construction, energization, completion, or operation.

Definitions: record units · roles · capacity boundaries · lifecycle stages.

What remains unknown

Sources

Record history

Record history · 12 May 2026 · DataCenterData review

stak-energy-campus-north-slope-ak → Record

Why Alaska DNR issued a preliminary decision proposing a negotiated state-land lease; this was not a final finding, lease or construction authorization.

Evidence No additional evidence link; see the linked record or claim.

Record history · 17 June 2026 · DataCenterData review

stak-energy-campus-north-slope-ak → Record

Why Alaska DNR extended the public-comment deadline through July 17, 2026.

Evidence No additional evidence link; see the linked record or claim.

DataCenterData record added · 14 September 2026 · DataCenterData review

stak-energy-campus-north-slope-ak → Publication

Why Qualified as one proposed campus; final lease action, construction, operation, roles and IT capacity remain unknown.

Evidence No additional evidence link; see the linked record or claim.

Data + actions

Permanent link for citing this record →

Suggest a correction → Record ID stak-energy-campus-north-slope-ak and the page are prefilled. Accepted material corrections appear on Changes.