Facts at a glance
- Record ID
project-cannoli-van-buren-township- Record type
- project
- Evidence confidence
- high
DataCenterData’s confidence in this record’s sourced fields, not in the project - Developer
- PDC VBT, LLC
- Operator
- Not named in the cited records
- Owner
- Owner of record not established
- Tenant
- Not named in the cited records
- Capacity
- 1 GW Utility request · campus scope
Maximum contract/load capacity in DTE testimony; not measured load, IT capacity or generation. - Location
- Van Buren Township, MI
County: Wayne County
Approximate location — East of Haggerty Road, north of the I-94 Service Drive, west of Hannan Road and south of I-275. - Physical scale
- 282.2 acres; agreement describes three planned data-center buildings, with Building 3 deferred to a future phase.
What the sources support
A May 19, 2026 development agreement records preliminary site-plan approvals and expressly says final site-plan approval had not yet been obtained. Wayne County's votes of September and October 2026 concern tax benefits and say they do not approve development. Later township and Michigan Public Service Commission action could not be read on 3 November 2026.
Definitions: record units · roles · capacity boundaries · lifecycle stages.
What remains unknown
- street address
- parcel
- owner
- operator
- final site-plan approval
- construction start
- critical IT capacity
- MPSC final disposition
Sources
-
Van Buren Township Data Center FAQ — Project Cannoli →Gov. record
Exact location Opening description; items 16 and 25
What it supports Project identity, location and source-document crosswalk.
-
Development Agreement between PDC VBT, LLC and Van Buren Township →Gov. record
Exact location Recitals A-F; sections 1.1-1.2, 2.1.2, 2.2 and 6.2; Exhibit A
What it supports Developer, project area, planned buildings, preliminary approvals and missing final approval.
-
DTE testimony, MPSC Case U-22058 →Gov. record
Exact location NTF-8 to NTF-9, Q15-Q17
What it supports Google customer identity in the utility contract and 1,000 MW maximum load/contract capacity; not operator status.
-
Wayne County Commission journal, 15 September 2026 →Gov. record
Exact location Committee report item on Industrial Development Districts 26 and 27, Project Cannoli
What it supports County resolution on receiving Public Act 198 property tax benefits approved or later approved by the township. The journal says it is not approval of the development and construction of the project.
-
Wayne County Commission journal, 1 October 2026 →Gov. record
Exact location Communication of 25 September 2026 submitting the veto; motion to override; Resolution No. 2026-685
What it supports County Executive veto of Resolutions 2026-674 and 2026-675, and the Commission override, 13 yes, none no, two absent.
Related claims
Sourced classifications
Only values a cited source states for this site are shown; every other dimension is unknown. These are not national shares or rankings.
- Power counterparty: DTE Electric Company — Utility under a customer-specific contract (agreement applied)
“contracts that have been executed between the Company and Google LLC” — Qualifications and Public Direct Testimony of Neal T. Foley, DTE Electric Company, MPSC Case No. U-22058, Testimony p.NTF-3 (PDF p.4), Q6/A6, line 6 (contracts listed at lines 8–9: Primary Supply Agreement, Clean Capacity Accelerator Agreement); site at NTF-8 Q16/A16 (PDF p.10): 'The data center will be located in Van Buren Township, Michigan, within the Company’s service territory. It will be developed on roughly 280 acres.'; project name tie at Beynard testimony SNB-5 (PDF p.157): ITC's transmission project 'is outlined in MISO Expedited Review Request Cannoli 1', retrieved 24 September 2026
Not established: Commission approval (this is the utility's testimony, not an order); that this Google customer is the same entity as the record's developer PDC VBT, LLC; MW drawn; construction.
Connected records
Each connection below is a stored, reviewed relationship with its own basis. It does not change this record’s status.
Metro area: Detroit-Warren-Dearborn, MI
Record history
Record history · 11 February 2026 · DataCenterData review
project-cannoli-van-buren-township → Record
Why First preliminary site plan approved.
Evidence No additional evidence link; see the linked record or claim.
Record history · 13 May 2026 · DataCenterData review
project-cannoli-van-buren-township → Record
Why Subsequent preliminary site plan approved.
Evidence No additional evidence link; see the linked record or claim.
Record history · 19 May 2026 · DataCenterData review
project-cannoli-van-buren-township → Record
Why Development agreement executed; final site-plan approval remained outstanding.
Evidence No additional evidence link; see the linked record or claim.
Record history · 15 September 2026 · DataCenterData review
project-cannoli-van-buren-township → Record
Why Wayne County Commission adopted a resolution on receiving Public Act 198 property tax benefits for the project. It says this is not approval of the development and construction.
Evidence No additional evidence link; see the linked record or claim.
Record history · 25 September 2026 · DataCenterData review
project-cannoli-van-buren-township → Record
Why The County Executive sent a veto of Resolutions 2026-674 and 2026-675.
Evidence No additional evidence link; see the linked record or claim.
Record history · 1 October 2026 · DataCenterData review
project-cannoli-van-buren-township → Record
Why The Commission overrode the veto, 13 yes, none no and two absent, recorded as Resolution 2026-685.
Evidence No additional evidence link; see the linked record or claim.
Record history · 3 November 2026 · DataCenterData review
project-cannoli-van-buren-township → Review
Field Review
Why County journals read. Township and Michigan Public Service Commission pages do not permit automated access, so final site-plan approval and the utility case were not re-read.
Evidence No additional evidence link; see the linked record or claim.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Reviewed record project-cannoli-van-buren-township
Project.
Location and precision
- Shown above in Facts at a glance.
Roles
- Shown above in Facts at a glance.
Lifecycle
- Recorded status: approved
Area, acreage and buildings
- Shown above in Facts at a glance.
Power capacity
- Shown above in Facts at a glance.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.