Flagship evidence ledger · Water

Microsoft Quincy: a documented benefit with important limits.

EPA’s case study documents the reuse utility operating as of its reporting period and estimates 138 million gallons of annual potable-water savings. It is not a zero-water system, and that figure is not total campus consumption.

Operator: MicrosoftPlace: Quincy, WashingtonSource period: operating from 2021; EPA record reviewed in 2026Last checked: 10 September 2026
QuestionWhat do the published water-reuse figures measure for Microsoft’s Quincy campus—and what do they not measure?
FindingEPA documents a city-owned Quincy Water Reuse Utility that became operational on 30 June 2021 under a 30-year city–Microsoft finance/operating agreement. EPA estimates 138 million gallons/year of potable-water demand offset. Microsoft financed $31 million of capital. The system recirculates cooling water after treatment; evaporation still requires make-up water, including Columbia Basin Project canal water.
30 yearsCity–Microsoft finance and operating agreement (EPA)
$31MCapital cost financed by Microsoft, per EPA
138M gal/yrEstimated potable-water savings—not consumption
260M gal/yrColumbia Basin Project canal make-up cited by EPA
30 Jun 2021QWRU operational date (EPA)

Timeline

More than 10 years of planning

EPA describes more than a decade of planning and construction before the utility opened.

Reuse utility begins operation

EPA: the Quincy Water Reuse Utility officially became operational. As of 2022, only Microsoft’s campus was connected among industrial users contemplated.

138M gal/yr potable offset published

Government estimate of annual potable demand offset from reuse—not a campus-wide meter total.

Quantities and claim class

Observed (government)

Operating reuse utility and 30-year agreement

EPA states the city owns and operates the QWRU; Microsoft financed capital and related costs under a 30-year agreement.

Estimate (government)

138 million gallons/year potable savings

EPA “Demand Offset” figure. Unit is estimated potable-water avoided, not measured campus withdrawal.

Estimate (government)

260 million gallons/year canal make-up

EPA cites Columbia Basin Project / Quincy Irrigation District canal water primarily in summer peak cooling periods.

Company claim retained separately

Microsoft launch narrative

Microsoft’s local blog is recorded as a company account (including its larger volume figure). It does not override the EPA estimate on this page.

Claims

A verdict applies only to the wording shown.

Company claims are shown as stated; they are not findings.

Water & cooling · Microsoft Quincy

Sources re-read on 12 September 2026 (software-assisted second check, not an outside audit)

Supported as of EPA observations spanning operation from 2021, 2022 connection status and early-2023 context

Said in US EPA case study · government record →

Checked 12 September 2026 · Next check: Recheck current operating status against a later agency or utility record

EPA documents an operating water-reuse system serving Microsoft's Quincy campus.

What the evidence supports

EPA documents operation beginning June 30, 2021 and describes a city-operated treatment and recirculation system serving Microsoft's campus. EPA estimates 138 million gallons per year of potable-water savings, reports about 260 million gallons per year of canal-water makeup and says potable groundwater supplies about 5% of annual makeup. These are different measures and are not additive total consumption or a current meter audit.

Biggest limitation

Current measured withdrawal, consumption and discharge;

Still unknown

Current measured withdrawal, consumption and discharge; a reconciled explanation of Microsoft's separate 380-million-gallon estimate; and operating changes after EPA's dated observations.

Confidence: high — government case study · 1 source

Open full claim → History (1) →

History

Correction · 12 September 2026 · Software-assisted second check

microsoft-quincy → Cooling + water

Field Cooling + water

From Microsoft Quincy: Supported as delivered; combined measures and a 2021-2022 observation window

To EPA documents an operating reuse system; distinct estimates and dated observations are separated

Why The second review separated estimated savings, canal makeup and potable makeup share and removed an unsupported original-publication year.

Evidence No additional evidence link; see the linked record or claim.

Cooling and water classification

Architecture: evaporative heat rejection with cooling water cycled four to five times, followed by municipal treatment and recirculation. “Closed loop” describes the industrial wastewater circuit; it does not mean no evaporation.

Sources: recycled cooling water, Columbia Basin Project canal water for much of the make-up volume, and a small potable-groundwater share. Brine is concentrated in lined evaporation ponds.

Unresolved matters

Primary sources

Review date on this page follows the Microsoft Quincy record check token and is not advanced merely because wording was clarified.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Reviewed record microsoft-quincy

Campus · Microsoft. Independently reviewed record. Values are shown with their recorded basis.

Location and precision

  • Quincy, WA (Place centre, not the site)

Roles

  • Operator: Microsoft

Lifecycle

  • Recorded status: operating

    Supported as delivered

Cooling, water, PUE and WUE

  • Water statement: EPA estimate: 138M gal/year potable-water savings; 260M gal/year canal make-up campus scope

    Recorded water statement, not a power capacity and not a measured figure.

Sources, dates, limitations and corrections

  • Sources: 1 cited source, listed on this page

Not yet recorded here: Area, acreage and buildings · Power capacity · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Data + actions

Suggest a correction → Record ID microsoft-quincy and the page are prefilled. Accepted material corrections appear on Changes.

Facility evidence across sources

Identity

Facility ID
dcd-fac-002539 (public id fac-002539)
Unit
campus
Name source
Microsoft Quincy · DataCenterData reviewed record microsoft-quincy
Evidence tier
reviewed

Operators and presences

1 statement(s) naming an operator or presence at this site unit, one row per source. A building with several tenants is one facility with several presence rows.

Operator of record (reviewed): Microsoft.

Operator as statedRoleUnitStated byDate
Microsoft
Family: Microsoft
owner or operator (reviewed)campusDataCenterData reviewed record microsoft-quincy

Status by layer

LayerValueDateSource
Reviewed (DCD) · verified recordoperating
Status basis: Supported as delivered
Latest source retrieval/capture date DataCenterData reviewed record microsoft-quincy

Location

City
Quincy
State
WA

Coordinates not published; precision is city-level.

Address as published by DataCenterData reviewed record microsoft-quincy. No member source publishes a street address for this facility.

Sources for the reviewed record

These citations belong to the linked reviewed records. They do not establish every figure or present-day operating status. Publication and retrieval dates are shown separately; an unstated date remains unknown.

  • US EPA case study · record microsoft-quincy · published date not stated (recorded date note: 2023) · retrieved

Details still needed

34 fields in the shared profile are not established for this record. Each states why; missing information does not mean zero or absence.

  • Street address · not recorded for this field in the register
  • County · not recorded for this field in the register
  • Postal code · not recorded for this field in the register
  • Metropolitan area · not recorded for this field in the register
  • Coordinates · not recorded for this field in the register
  • Map location precision · not recorded for this field in the register
  • Provider-reported status · not recorded for this field in the register
  • Operator-stated status · not recorded for this field in the register
  • Status in public records · not recorded for this field in the register
  • Critical IT capacity (MW) · not recorded for this field in the register
  • Utility capacity (MW) · not recorded for this field in the register
  • Requested utility capacity (MW) · not recorded for this field in the register
  • Reported total power (MW) · not recorded for this field in the register
  • Generation capacity (MW) · not recorded for this field in the register
  • Company-announced design capacity (MW) · not recorded for this field in the register
  • Provider-reported capacity (MW) · not recorded for this field in the register
  • Floor area (sq ft) · not recorded for this field in the register
  • Data hall or IT floor area (sq ft) · not recorded for this field in the register
  • Site area · not recorded for this field in the register
  • Cooling redundancy · not recorded for this field in the register
  • UPS redundancy · not recorded for this field in the register
  • Backup generator redundancy · not recorded for this field in the register
  • Tier design rating · not recorded for this field in the register
  • Cooling technology · not recorded for this field in the register
  • Opening year or expected opening year · not recorded for this field in the register
  • Network presence · not recorded for this field in the register
  • Service · not recorded for this field in the register
  • Certification or compliance claims · not recorded for this field in the register
  • Rack density · not recorded for this field in the register
  • Space or power availability · not recorded for this field in the register
  • Specifications and facility pages · not recorded for this field in the register
  • Business contact · not recorded for this field in the register
  • Public registration · not recorded for this field in the register
  • Fact supported by a source quotation · not recorded for this field in the register

Jurisdiction and policy actions

Policy actions are matched to this facility by jurisdiction (state, county, municipality or utility), never by the facility's name. A match means the action covers the place, not that it names or affects this facility.

Updates, corrections and review

Last checked

How often we re-check

We plan to re-check this facility every 180 days because it has a reviewed record. Next check due . The last-checked date is the newest evidence date among this facility's sources. Dates are measured against the newest input date, , not the day this page was built.

Corrections

  • · The second review separated estimated savings, canal makeup and potable makeup share and removed an unsupported original-publication year. details

Related claims

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

How complete the facility register is

Open identity review

These questions are open. Nothing has been merged or dismissed; a reviewer resolves each with captured evidence.

  • A possible duplicate of Microsoft MWH Data Center (fac-001099) is under review (reason: city_only_ambiguous, opened ; hold hold-000050). Evidence needed: A street address, parcel id or coordinate source for the city-only row identifying which candidate (if any) it describes.
  • A possible duplicate of Microsoft MWH Data Center (fac-001099) is under review (reason: city_only_single_candidate, opened ; hold hold-000213). Evidence needed: A street address, parcel id or coordinate source for the city-only row, or a reviewed decision on the candidate.

Rights for this record

For each populated field, the origin of the value shown on this page and the terms it carries. Values that are not redistributable may be read and cited here but are not relicensed.

FieldSupplied byOriginLicenseAttributionRedistributable
current_nameDataCenterData reviewed record microsoft-quincydcd reference onlyreference onlyDataCenterDatano
location.cityDataCenterData reviewed record microsoft-quincydcd reference onlyreference onlyDataCenterDatano
location.city_keyDataCenterData reviewed record microsoft-quincydcd reference onlyreference onlyDataCenterDatano
location.stateDataCenterData reviewed record microsoft-quincydcd reference onlyreference onlyDataCenterDatano
presences[0]DataCenterData reviewed record microsoft-quincydcd reference onlyreference onlyDataCenterDatano
operator_of_recordDataCenterData reviewed record microsoft-quincydcd reference onlyreference onlyDataCenterDatano
status_by_layer[0]DataCenterData reviewed record microsoft-quincydcd reference onlyreference onlyDataCenterDatano
lifecycle_statusDataCenterData reviewed record microsoft-quincydcd reference onlyreference onlyDataCenterDatano
status_basisDataCenterData reviewed record microsoft-quincydcd reference onlyreference onlyDataCenterDatano