campus · CA · last checked 18 September 2026

Goodman Energy Park (GEP) data center

Lifecycle label: proposed; effective date not established Status evidence: Governor's Office of Land Use and Climate Innovation (LCI) / State Clearinghouse CEQAnet, SCH 2026080118; Document Type row 'NOP - Notice of Preparation of a Draft EIR'; Document Description, first sentence. The CEQAnet date label for 2026-08-05 is 'Received' - receipt of the notice by the State Clearinghouse, not a publication or posting date. California Energy Commission project page for the Vernon Backup Generating Facility, docket 25-SPPE-01, summary table row 'Project Status: Under Review'. A Notice of Preparation begins CEQA environmental review; it is not an approval, exemption, permit, entitlement, construction start or operation. Evidence: Independently source-linked Reuse: Reference only

Facts at a glance

Record ID
goodman-energy-park-data-center-vernon-ca
Record type
campus
Developer
Not named in the cited records
Operator
Not named in the cited records
Owner
Owner of record not established
Tenant
Not named in the cited records
Capacity
up to 99 MW onsite generation planned · campus scope
Proposed emergency backup generation only. The CEC page states the facility would be used exclusively to provide up to 99 MW of backup emergency generation when Vernon Public Utility electricity is unavailable. This is not IT load, utility service capacity, or permitted generation. Do not aggregate it with other figures.
Location
Vernon, CA
County: Los Angeles County
approximate — CEQAnet and the CEC page place two data-center buildings at 3163 and 3049 East Vernon Avenue, Vernon, on parcels 6303-005-035 and 6303-005-036.
Physical scale
Physical scale: Two data-center buildings at 3163 and 3049 East Vernon Avenue, as stated in the CEC and CEQAnet notices.

What the sources support

A CEQAnet Notice of Preparation received on 5 August 2026, and the California Energy Commission project page for docket 25-SPPE-01, describe a proposed Goodman Energy Park data-center campus of two buildings in Vernon with a backup generating facility still under review. A notice of preparation is not an approval, permit, construction start or operation. A CEC Project Owner row for the backup-generating-facility docket is not campus ownership.

Definitions: record units · roles · capacity boundaries · lifecycle stages.

What remains unknown

Sources

Record history

Record history · 5 August 2026 · DataCenterData review

goodman-energy-park-data-center-vernon-ca → Record

Why The State Clearinghouse received the CEC Notice of Preparation of a Draft EIR (SCH 2026080118). Received is not a publication or approval date.

Evidence No additional evidence link; see the linked record or claim.

DataCenterData record added · 18 September 2026 · DataCenterData review

goodman-energy-park-data-center-vernon-ca → Publication

Why Added from the opened CEQAnet and CEC records. Backup-generation capacity is recorded as proposed onsite generation, not IT load.

Evidence No additional evidence link; see the linked record or claim.

Data + actions

Permanent link for citing this record →

Suggest a correction → Record ID goodman-energy-park-data-center-vernon-ca and the page are prefilled. Accepted material corrections appear on Changes.