Facts at a glance
- Record ID
brookfield-paducah-site-ai-campus-ky- Record type
- campus
- Evidence confidence
- high
DataCenterData’s confidence in this record’s sourced fields, not in the project - Developer
- Brookfield
- Operator
- Brookfield
- Owner
- Owner of record not established
- Tenant
- Not named in the cited records
- Capacity
- 1.8 GW Company-announced design · campus scope
DOE describes a new 1.8 GW AI/HPC campus but does not label the figure critical IT load, gross facility load, approved utility service, measured load or current consumption. It is retained only as an announced campus design. - Location
- KY
Approximate location — The announcement limits the location to portions of DOE's Paducah Site in western Kentucky. The federal site's proper name is not converted into a city, street address, county, parcel or coordinate. - Physical scale
- Unknown. The announcement provides no data-center building count, floor area, site acreage or parcel boundary. The announced investment and job estimates are not physical scale.
What the sources support
The U.S. Department of Energy's July 29, 2026 announcement establishes a partnership and says Brookfield was selected to develop and operate a data center campus on portions of the Paducah Site. It does not say campus construction started, and the power-service agreement remained subject to Kentucky Public Service Commission approval. The expected 2031 completion is a forecast.
Definitions: record units · roles · capacity boundaries · lifecycle stages.
What remains unknown
- street address
- parcel
- city and county situs for the selected campus portions
- coordinates
- data-center land or building owner
- tenant
- critical IT capacity
- gross facility load
- approved utility-service amount
- measured load
- Kentucky PSC case number and decision
- building count or floor area
- construction-start evidence
- completion or opening evidence
Sources
-
Exact location Opening paragraph; ratepayer-protection paragraph; participant-selection paragraph; final construction-forecast sentence
What it supports Campus proposal and Paducah Site location boundary; Brookfield's selected future developer/operator roles; announced 1.8-GW AI/HPC campus design; separate generation and storage roles; pending PSC approval; forecast 2031 completion.
Sourced classifications
Only values a cited source states for this site are shown; every other dimension is unknown. These are not national shares or rankings.
- Workload: AI or high-performance computing
“NextEra Energy plans to develop 2 gigawatts (GW) of new grid-connected natural gas-fired generation, upgrade existing transmission infrastructure, and deploy up to 2.6 GW of battery energy storage to support a new 1.8 GW artificial intelligence and high-performance computing (HPC) innovation campus.” — Energy Department Announces Partnership to Expand Reliable, Affordable Energy Access and Power America's AI Future in Western Kentucky, Article body, third paragraph ('At or near the Paducah campus…'), retrieved 24 September 2026
Not established: That any AI/HPC workload runs today (construction expected to complete 2031); tenants; that the 1.8 GW design is built. - Power source: Utility grid service
“Jackson Purchase Energy Cooperative will provide retail electric service” — Energy Department Announces Partnership to Expand Reliable, Affordable Energy Access and Power America's AI Future in Western Kentucky, Article body, paragraph beginning 'in November 2025, Brookfield was selected', retrieved 24 September 2026
Not established: Whether the NextEra gas and battery resources are on the campus or behind the meter ('at or near', 'grid-connected'); approval; energization. - Power counterparty: Jackson Purchase Energy Cooperative — Serving utility (agreement planned)
“Big Rivers Electric Power Corporation will provide wholesale electric service, Jackson Purchase Energy Cooperative will provide retail electric service, and Paducah Power System will serve as a community partner.” — Energy Department Announces Partnership to Expand Reliable, Affordable Energy Access and Power America's AI Future in Western Kentucky, Article body, paragraph beginning 'in November 2025, Brookfield was selected', retrieved 24 September 2026
Not established: Kentucky PSC approval (the next sentence says the power service agreement remains subject to approval by the Kentucky Public Service Commission); contracted or delivered MW; energization.
Record history
Record history · 29 July 2026 · DataCenterData review
brookfield-paducah-site-ai-campus-ky → Record
Why DOE announced the Paducah partnership and participant selections; the power-service agreement remained subject to Kentucky PSC approval.
Evidence No additional evidence link; see the linked record or claim.
DataCenterData record added · 13 September 2026 · DataCenterData review
brookfield-paducah-site-ai-campus-ky → Publication
Why Added as one proposed campus; the 1.8 GW remains an announced design figure and separate generation and storage figures were excluded.
Evidence No additional evidence link; see the linked record or claim.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Reviewed record brookfield-paducah-site-ai-campus-ky
Campus · Brookfield.
Location and precision
- Shown above in Facts at a glance.
Roles
- Shown above in Facts at a glance.
Lifecycle
- Recorded status: proposed
Area, acreage and buildings
- Shown above in Facts at a glance.
Power capacity
- Shown above in Facts at a glance.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
Data + actions
Permanent link for citing this record →
Suggest a correction → Record ID brookfield-paducah-site-ai-campus-ky and the page are prefilled. Accepted material corrections appear on Changes.