Florida index · last changed 13 September 2026

Florida data centers: what the public record shows.

Selected source-linked records are published below. This is not a complete inventory of Florida data centers.

9 sourced policy records for Florida ↓Facility register: 66 records · by county →1 published DataCenterData record · evidence status shown per row51 licensed directory leads · not independently verifiedThese counts overlap and are not added together

Explore Florida

Map, listings and checked facts.

Start with 51 licensed source leads, then inspect the separate public-evidence layer below. Licensed rows are not independently verified and are not a statewide census.

Florida map

Reported locations in Florida

51 licensed rows · 28 source localities · 4 map targets

Open interactive map
Source-reported points; some are approximate. Not parcel boundaries. Exact Approximate or representative Bounded nearby groupA number on a marker is the count of licensed rows it holds.Licensed layer only (Compute Atlas, source data through 14 October 2026). The interactive map lists 91 data-center source listings here across licensed, operator and DataCenterData layers (61 with a map point); 91 with government registry records. Source listings are not distinct sites.
Browse 4 mapped areas as links
Map sources and method

The state outline is adapted from the U.S. Census Bureau 2025 cartographic boundary file. Facility coordinates are adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Outline and markers use one geographic projection before any explicitly disclosed readability offset. Exact singleton source anchors are never moved. A one-kilometre boundary tolerance prevents the simplified 1:20,000,000 outline from hiding legitimate border-area source points; farther conflicts are disclosed, not clamped. DataCenterData groups source-reported city coordinates only within a bounded map radius; the outline does not validate a facility record. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

51 licensed rows27 reported city labels37 eligible organization labels

Browse all 51 rows below. Licensed rows are not independently verified and remain separate from the checked public-evidence layer.

  1. source-reported operationalCapacity not statedSource updated 21 September 2026approximate location
  2. source-reported cancelledCapacity not statedSource updated 21 September 2026approximate location

Separate layer

Also listed by operators

Sites that operators list on their own websites and that are not rows in the licensed directory above. They are kept apart and never added to the licensed rows.

20 operator-listed sites (mixed units; not added to licensed rows) in Florida →

10 of these sites have no supported coordinate. The map does not invent a pin or a metro placement for them.

Florida evidence at a glance

A few checked sites

Selected public evidence, not a statewide census. Each row shows whether it is independently source-linked, attributed, or unresolved; licensed leads remain separate.

Published project / campus
0
Published facility / building
1
Attributed or unresolved rows
0
Licensed directory leads
51 not independently verified
Capacity boundary stated
0 of 1 published DataCenterData rows
Review timing
Audit through 12 September 2026 · next 12 March 2027
Known coverage gap

No public roster of DR-14DCP certificate holders was found; recipient names may be confidential taxpayer information.

Browse all 51 Florida licensed leads → · Why these counts differ →

Buildings

1 building record. Names are as they appear on each record page.

Buildings published for Florida
Record / rolesStatusCapacity / scalePrimary evidence
HostDime AI/Data CenterOperator: HostDime constructionbuilding UnknownNo independently supported figureNo primary-source critical IT capacity, utility-service capacity, generation or measured-load figure was established. Town of Eatonville regular council meeting packet — July 7, 2026 →Gov. record

Where the records were checked

Statewide audit pending

A few checked sites

This is not a list of every data center in the state, and the number here is not a count of them. There are almost certainly more.

Statewide coverage is not complete. The records below are sourced; a full statewide count has not been published.

State research audit window ended 12 September 2026. Individual records and claims below show their own evidence dates and may be newer.

Next scheduled coverage review: 12 March 2027.

0 independently source-linked project/campus records; 1 independently source-linked facility/building record; 0 attributed or unresolved rows. These counts use different units and must not be added together.

Source families checked, selected records and remaining gaps

These notes name selected records, say which kinds of public evidence were checked and show what remains missing. They do not add anything to the published counts.

  • Economic development incentives — Partly checked
    • No public roster of DR-14DCP certificate holders was found; recipient names may be confidential taxpayer information.
    • SelectFlorida and county economic development authority announcement archives were not swept.
    • No Florida Commerce or Governor's Office project-award announcement was retrieved.

    Selected records

  • Utility commission and large-load records — Checked
    • The FPSC docket index itself was not browsed, so other 2025-2026 filings that might name specific customers were not enumerated.
    • FPL and Duke ten-year site plans and any special contracts or electric service agreements were not retrieved.
    • No Florida utility publishes a large-load interconnection queue that was reachable in the current review.

    Selected records

  • Environmental and construction permits — Partly checked
    • APDS was down for maintenance; no air permit keyword search was completed for Florida.
    • Water management district Environmental Resource Permits (SFWMD, SJRWMD, SWFWMD) were not searched, including the CoreSite OR1 ERP modification reported for May 2026.
    • County and city building, grading and generator permit portals were not searched.

    Selected records

  • Local planning, assessor and map records — Partly checked
    • St. Lucie County's Laserfiche public portal was not queried directly for Sentinel Grove, Willow Lakes or Atlas Compute.
    • Citrus County, Okeechobee County, Osceola County, Nassau County and Miami-Dade County agenda and minutes systems were not reached.
    • The Palm Beach County zoning resolution ZR-2025-014 download failed (connection reset) and the post-hearing BCC resolution recording the denial was never located.
    • No Florida property appraiser or GIS parcel record was queried, so no research lead has a parcel ID confirmed from an assessor.
    • The Fort Pierce city rezoning file for Willow Lakes was not located.

    Selected records

  • Tax abatements and development agreements — Partly checked
    • Fort Meade's ordinance and agenda documents could not be retrieved during review; the development agreement text and its ordinance number are unknown.
    • Florida counties' economic development ad valorem exemption ordinances were not searched.
    • No county or city development, PILOT or infrastructure agreement was retrieved for any research lead.
  • Operator disclosures — Partly checked
    • Equinix's Miami IBX roster was blocked, so Equinix facilities beyond MI1 are unaccounted for.
    • CoreSite, Digital Realty, Flexential, QTS, RadiusDC, Iron Mountain, Metrobloks and HostDime operator pages were not individually read.
    • No hyperscaler location page was opened to confirm the absence of Florida sites; the finding rests on search results only.

    Selected records

  • Open datasets and directories — Checked
    • Compute Atlas source URLs were followed only for the Project Tango, Sentinel Grove and FPSC leads; most of its underlying press and operator links were not yet reviewed directly.
    • No unlicensed directory (Data Center Map, Baxtel, datacenters.com, PeeringDB) was used, so directory-only Florida facilities absent from Compute Atlas are missing.

    Selected records

  • Closures, withdrawals and former names — Checked
    • No county record of any of the five withdrawals or denials was retrieved; each rests on news or the Compute Atlas status field.
    • Older Florida closures, demolitions, renames and acquisitions before 2024 were not searched at all.
    • The Equinix MI1 rename from NAP of the Americas and the RadiusDC ownership chain were taken from Compute Atlas notes and not confirmed against filings.

    Selected records

  • News and other discovery — Partly checked
    • Only two news articles were opened; most reporting was seen as search-result snippets and is not cited.
    • Advocacy trackers such as FloridaDataCenters.org were seen in search results but never opened or cited.

Local evidence by place

Licensed and operator listings, reviewed records, answers and local policy for each place. Listings overlap and are not added; a place without a line here has no published local evidence.

No local evidence answer, reviewed record or local policy record is published for Arcadia, Boca Raton, Doral, Fort Lauderdale, Fort Pierce, Jacksonville, Lakeland, Miami, Orlando, Sweetwater, Tampa. Their listings above are source listings to investigate. No statewide evidence answer is published for Florida either; statewide rules are under Policy tracker below.

Policy tracker

Florida policy records

9 sourced records are associated with this state context. They are grouped below as current, pending and nonbinding, and history, and each card shows its relevant date. These are not facility counts and do not cover every locality.

Current 4 records

Recorded as in effect on the dataset date. This does not mean every project in a represented state is restricted or approved.

Enacted legislation or regulation

SB 484 (2026): large load tariffs and large-scale data center water permits (ch. 2026-65)

In effect · Florida · State

Effective: 1 July 2026

Issuing authority: Florida Legislature

Florida Senate Bill 484 of 2026, chapter 2026-65, requires public electric utilities to file large load tariffs for 50-megawatt and larger customers by 1 October 2026 and not to serve such customers that are foreign entities, conditions water-use permits for large-scale data centers, keeps local planning authority over large load customers, defines "data center" for a public-records provision, and orders an OPPAGA study.

Read the sourced record · Primary source

Pending or nonbinding 3 records

Adopted measures with unverified effect, adopted future measures, open proceedings, proposals, drafts and nonbinding context stay separate from current rules.

Local construction moratorium · Manatee County only (local rule)

Manatee County: 12-month pause on new data center development applications (Ordinance 26-42)

Adopted; effective status unverified · Unincorporated Manatee County, Florida · Local

Adopted: 8 October 2026

Issuing authority: Manatee County Board of County Commissioners

Manatee County announced on 8 October 2026 that its Board of County Commissioners adopted Ordinance 26-42 after the second and final public hearing.

Read the sourced record · Primary source

Local construction moratorium · Hernando County only (local rule)

Hernando County: 365-day moratorium on data center development orders and permits (Ordinance 2026-15)

Adopted; effective status unverified · Hernando County, Florida · Local

Adopted: 23 June 2026

Issuing authority: Hernando County Board of County Commissioners

The Hernando County Board of County Commissioners adopted Ordinance No. 2026-15 on 23 June 2026, according to the county clerk's filing with the Florida Department of State, which acknowledged the filing on 24 June 2026.

Read the sourced record · Primary source

Local construction moratorium · Nassau County only (local rule)

Nassau County: 12-month pause on data center rezoning, permit and site plan applications (Ord. 2026-044)

Adopted; effective status unverified · Unincorporated Nassau County, Florida · Local

Adopted: 8 June 2026

Issuing authority: Nassau County Board of County Commissioners

Nassau County's Board of County Commissioners approved Ordinance No. 2026-044 on 8 June 2026, according to the county's data centers page.

Read the sourced record · Primary source

History 2 records

Expired, repealed, vetoed, failed, blocked, superseded and completed measures remain visible without being presented as current.

Open the Florida policy comparison

Review dates: the 9 Florida records were last checked 23 September 2026 to 3 November 2026. 1 scheduled review is overdue as of the tracker date 3 November 2026: HB 7031 (2025) section 46 amends the data center property exemption (last checked 23 September 2026, review due 23 October 2026). Overdue means not re-read yet, not changed. No single record, and not this list, establishes complete statewide policy coverage.