Switch KEEP 2.0 Atlanta North Campus

source-reported under construction

Switch

South of Old Alabama Road at Bates Road · Cartersville · Bartow County · Georgia

Capacity not statedSource updated 14 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Switch KEEP 2.0 Atlanta North Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Switch
Address and locality
South of Old Alabama Road at Bates Road · Cartersville · Bartow County · Georgia
Official metro area
Atlanta-Sandy Springs-Roswell, GA
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Not stated
Source freshness
14 October 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001978

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Cooling
Not establishedThe provider reports water information but no cooling type.
Reported water use
1.3 million gallons per day (source-reported)Whether this is metered use, a permit limit or a request is not established; see the provider water note.
Land area
126 acres (source-reported; parcel boundary not established)
Announced investment
$772 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
Announced
August 2023Provider-reported announcement date.

Provider notes

Energy. Georgia Transmission Corporation's planned Brandon Farm–Pittman Lake 230 kV line (about 5.17 miles across Bartow and Paulding counties) will serve the Switch data center in Cartersville; clearing is scheduled for Q2 2027, construction for Q3 2027 and service for Q2 2028. Bartow County Administrator Peter Olsen said Switch is powered by "Georgia EMC" with a 1,200 megawatt commitment (GPB, paraphrased); the specific cooperative was not named. The DRI's energy section is blank.

Water. DRI #4061 estimates 1.3 MGD water supply demand and 0.65 MGD wastewater, provided by Bartow County. Bartow County's August 2026 policy statement says Switch "initially inquired about future phases using evaporative cooling" but "most recently they have stated that all their customers prefer to use closed loop because water is so controversial."

Community. Some residents objected at the rezoning stages. In November 2023, resident Vicki Cox wrote to the city planner opposing the Technology District rezoning, citing power outages, noise, environmental impact and traffic. At the July 2025 annexation and rezoning, residents raised concerns about access from Etowah Ridge Trail, and the approval barred it. No organized opposition campaign against the Switch campus was found.

What the source record says

Switch's second Georgia campus; distinct from its operational "The Keep" campus in Lithia Springs, Douglas County. Per DRI #4061 (submitted 2023-08-29 by the City of Cartersville): location "South of intersection of Old Alabama Rd and Bates Rd to Paulding County line within City of Cartersville"; a first phase of 126 acres with a single data center building about 1,620 ft long plus driveways, detention ponds and an electrical substation, described as 6.5% of the overall acreage; this phase targeted for Q2 2026 and the overall project for 2046; estimated build-out value $772 million and about $15 million a year in local tax revenue. Property owner per the DRI: Carter Grove (Atlanta) ASLI VI. In November 2023 the city rezoned the roughly 1,946 acres remaining in the Carter Grove Planned Development to a Technology District; the city approved a further annexation and rezoning for the campus in July 2025, with a condition barring any access, including construction access, from Etowah Ridge Trail. Bartow County's August 2026 policy statement says Switch "has not disclosed numbers, but its campus is larger than Digital Realty and its buildout could well be larger," that Switch has not forecast jobs, and that the county has granted no tax abatements or payment-in-lieu-of-taxes arrangements to these facilities. Status: aggregator sites report phase 1 as operational, but no primary source confirming construction or operation was found, so the record stays at the November 2023 rezoning approval. Coordinates are the Old Alabama Road / Bates Road intersection from OpenStreetMap, the reference point the DRI gives; the campus lies south of it.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2023-08-29 · source-reported proposed

    City of Cartersville submitted Development of Regional Impact #4061, "Switch KEEP 2.0 Atlanta North Campus" (developer Switch, LTD), to the Georgia DCA.

    Open cited source →

  2. 2023-11-02 · source-reported permitted

    Cartersville City Council voted unanimously to rezone the roughly 1,946 acres remaining in the Carter Grove Planned Development to a Technology District at Switch's request.

    Open cited source →

  3. 2026-10-14 · source-reported under construction

    Baxtel reports the first phase building is in place and two more buildings are under construction at the 126-acre Cartersville campus. The conservative status is used; Baxtel's 'operational' label is unverified.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID switch-keep-2-atlanta-north-cartersville-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001978

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • South of Old Alabama Road at Bates Road, Cartersville, GA · Bartow (Approximate location)

Roles

  • Operator: Switch

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: August 2023

    Provider-reported announcement date.

  • Status history: 2023-08-29 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2023-11-02 · source-reported permitted

    Status history supplied by the source.

  • Status history: 2026-10-14 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 126 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

  • Reported water use: 1.3 million gallons per day (source-reported)

    Whether this is metered use, a permit limit or a request is not established; see the provider water note.

Permits, incentives, jobs and proceedings

  • Announced investment: $772 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →