Licensed lead · not independently verified · dcd-dir-001410

STACK ATL01 (formerly T5@Atlanta)

source-reported operational

STACK Infrastructure

3200 Webb Bridge Road · Alpharetta · Fulton County · Georgia · 30005

Reported operational 20 MWSource updated 8 August 2026exact location (provider label) · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for STACK ATL01 (formerly T5@Atlanta).

Exact source coordinates (provider label); this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
STACK Infrastructure
Address and locality
3200 Webb Bridge Road · Alpharetta · Fulton County · Georgia · 30005
Official metro area
Atlanta-Sandy Springs-Roswell, GA
Source-reported status
operational
Provider facility type
data center
Reported capacity
Operational: 20 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
8 August 2026
Location precision
exact (provider label)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001410

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Georgia PowerUtility as named by the provider.

What the source record says

3200 Webb Bridge Road, Alpharetta GA. Originally T5@Atlanta I; the site passed to STACK Infrastructure when IPI Partners combined the Infomart data centers with selected T5 assets to launch STACK on 2019-01-15 — Data Center Knowledge names Atlanta among the T5 contributions. STACK's own ATL01 page describes 2 buildings (ATL01A 105,000 sq ft, ATL01B 133,000 sq ft) and “20MW of critical capacity”; the record is therefore campus-level. The prior 14 MW single-building figure came from an aggregator directory and is not carried. The record id is unchanged to preserve its URL and history.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID t5-atlanta-i-ga. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001410

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 3200 Webb Bridge Road, Alpharetta, GA 30005 · Fulton (Exact location)

Roles

  • Operator: STACK Infrastructure

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

Power capacity

  • Reported capacity: Operational: 20 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Georgia Power

    Utility as named by the provider.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-08

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →