This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Berry Hill / Southern Virginia Megasite.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- STACK Infrastructure
- Address and locality
- Berry Hill · Pittsylvania County · Virginia
- Official metro area
- Outside an official metropolitan boundary
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 14 October 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001339
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Appalachian Power
- Power source
- Grid
- Cooling
- Not established
- Reported water use
- 7 million gallons per day (source-reported)
- Land area
- 2,990 acres (source-reported; parcel boundary not established)
- Announced investment
- $73 billion
- Announced jobs
- 2,050 permanent
- Community response
- Provider label: mixed
- AI-use label (provider)
- confirmed
- Announced
- March 2026
Provider notes
Energy. Initial power allocation of ~299 MW is required by end of 2028. STACK funds APCo transmission and generation upgrades and holds contingency rights tied to APCo confirming delivery.
Water. Performance agreement references 7 million gallons per day of water capacity allocated from the Dan River for the megasite buildout.
Community. The Pittsylvania County Board of Supervisors passed a resolution supporting the project, and Regional Industrial Facility Authority chair Vic Ingram publicly championed it, calling the investment historic. Erin Hall, a resident living four miles from the megasite, spoke against the project during public comment, questioning water and power safeguards and saying county meetings had been kept 'hush-hush.'
What the source record says
Performance agreement caps investment at up to $73.5B over 30 years (2,050 jobs); parallel reporting cites a ~$100B project scope. ~2,990 acres of the Southern Virginia Megasite; land deal ~$737.8M. investmentUsd reflects the conservative $73B figure from the March 2026 draft performance agreement (2,050 jobs, 30-year span, not yet signed); a May 2026 'final document' revised it upward to $100B / 2,500 jobs.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-06-30 · source-reported proposed
STACK confirmed moving forward.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- STACK commits $73.5bn investment into data center campus in Berry Hill, Virginia · Data Center Dynamics
- STACK Infrastructure says it's moving forward with AI data center in Pittsylvania · Cardinal News
- Cardinal News
- Pittsylvania supervisors back $100B Berry Hill Data Center project · WSET (ABC13)
- Local leaders approve $100B AI data campus in Pittsylvania County amid citizen concerns · WSET (ABC13)
- $100B data center project proposed at Berry Hill megasite advances · Virginia Business
- Berry Hill $100B data center performance agreement unanimously approved by officials · Construction Review Online
- Southside Virginia advances historic $100B Berry Hill data center campus despite resident pushback · Construction Review Online
- A data center project in Pittsylvania was approved Monday with higher investment and jobs than previously announced · Cardinal News
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID stack-berry-hill-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001339
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Berry Hill, VA · Pittsylvania (Approximate location)
Roles
- Operator: STACK Infrastructure
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: March 2026
Provider-reported announcement date.
- Status history: 2026-06-30 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 2,990 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Appalachian Power
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Not established
The provider reports water information but no cooling type.
- Reported water use: 7 million gallons per day (source-reported)
Whether this is metered use, a permit limit or a request is not established; see the provider water note.
Permits, incentives, jobs and proceedings
- Announced investment: $73 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 2,050 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Community response: Provider label: mixed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-10-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.