Licensed lead · not independently verified · dcd-dir-001177

Washington Township Technical Campus

source-reported cancelled

Prologis

South side of 32 Mile Road between M-53 and Powell Road · Washington · Macomb County · Michigan

Capacity not statedSource updated 9 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Washington Township Technical Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Prologis
Address and locality
South side of 32 Mile Road between M-53 and Powell Road · Washington · Macomb County · Michigan
Official metro area
Detroit-Warren-Dearborn, MI
Source-reported status
cancelled
Provider facility type
data center
Reported capacity
Not stated
Source freshness
9 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001177

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Land area
312 acres (source-reported; parcel boundary not established)
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →

Provider notes

Community. The proposal drew months of discussion and protests from Washington Township and neighbouring residents. After the withdrawal the township clerk proposed a temporary moratorium on all data-center applications, added to the 2026-05-20 board agenda, saying it 'will give our community time to put legal safeguards in place.'

What the source record says

312 acres on the south side of 32 Mile Road between M-53 and Powell Road, spanning four parcels near Romeo State Airport and the former Romeo Ford plant. Status 'cancelled' reflects the withdrawn application; the company's attorney stated an intent to return after the township revises its zoning ordinance, so this is a pause rather than confirmed abandonment. Note the rezoning alone would NOT have permitted a data center — the source states a further 'special land use' approval would have been required. CONFIRMED ABSENCES: no megawatt capacity, investment figure, building count, water figure or job count is stated in either source. Coordinates are the US Census geocoder's match for the 32 Mile Rd / Powell Rd intersection named in the source; the four-parcel boundary is not confirmed.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-11 · source-reported proposed

    Prologis submitted a conditional rezoning application for a technical campus and data center on 312 acres across four parcels, seeking an Industrial-Research-Technology district with a five-year reversion clause.

    Open cited source →

  2. 2026-05 · source-reported cancelled

    Prologis withdrew the rezoning application on 2026-05-19, stating it would wait until the township adopts a data-center ordinance before proceeding.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID prologis-washington-township-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001177

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • South side of 32 Mile Road between M-53 and Powell Road, Washington, MI · Macomb (Approximate location)

Roles

  • Operator: Prologis

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported cancelled

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2025-11 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-05 · source-reported cancelled

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 312 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-09

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →