This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for phoenixNAP PHX02.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- phoenixNAP
- Address and locality
- 3221 E Elwood St · Phoenix · Maricopa County · Arizona · 85034
- Official metro area
- Phoenix-Mesa-Chandler, AZ
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 50 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001120
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 6.54 acres (source-reported; parcel boundary not established)
Provider notes
Energy. AZBEX reports power for the building is to be supplied by Bloom Energy.
What the source record says
Second phoenixNAP data center, on a 6.54-acre parcel at 3221 E. Elwood St., across the street from the operator's 2010 facility. AZBEX reports 530,000 sq ft, roughly 15,000 racks at about 44 kW density, and initial capacity of 30 MW with potential to increase to 50 MW. Coordinates are geocoded from the cited street address (Nominatim and US Census geocoder agree to ~10 m); they are not parcel-confirmed.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026 · source-reported under construction
AZBEX reports the company hopes to have first-floor construction finished by Q4 2026; preliminary plan review was filed May 2024 and a zoning-adjustment time extension was granted 27 March 2025.
Sources and attribution
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID phoenixnap-phx02-phoenix-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001120
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 3221 E Elwood St, Phoenix, AZ 85034 · Maricopa (Approximate location)
Roles
- Operator: phoenixNAP
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2026 · source-reported under construction
Status history supplied by the source.
Area, acreage and buildings
- Land area: 6.54 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 50 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-10
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.