This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Nebius Vineland Data Center.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Nebius Group
- Address and locality
- South Lincoln Avenue · Vineland · Cumberland County · New Jersey
- Official metro area
- Vineland, NJ
- Source-reported status
- operational
- Provider facility type
- data center
- Reported capacity
- Operational: 100 MW; Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 21 September 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001034
The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.
- street: This street is provider-reported. DataCenterData has not independently resolved the earlier street-support review.
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Vineland Municipal Utilities Authority (supplemental, ~15%)
- Power source
- On-site gas
- Cooling
- Air
- Announced jobs
- 200 permanent
- Community response
- Provider label: mixed
- AI-use label (provider)
- confirmed
- Announced
- 2025
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- 5-year PILOT (Payment in Lieu of Taxes), Ordinance 2026-3 — dollar amount not publicly disclosed · City of Vineland, NJ · 2026 Open cited source →
- Five-year payment in lieu of taxes (PILOT) agreement · City of Vineland, NJ · 2026 Open cited source →
Provider notes
Energy. 32 high-efficiency natural gas engines generate approximately 85% of facility power; 6 diesel generators for backup. Proposed 1.5-million-gallon LNG storage tank as pipeline contingency (pending approval). NJDEP air permit under review as of early 2026; Sierra Club and Pinelands Alliance objecting to emissions profile. Facility located in Wellhead Protected Area near Kirkwood-Cohansey aquifer.
Water. Developer explicitly states facility will not consume water for equipment cooling (Philadelphia Inquirer, Jan 2026). A four-step exhaust reclamation system on the gas engines (selective catalytic reduction, oxy catalyst, wet scrubbers, biofilters) captures condensate from engine exhaust for recycling — this is emissions control on the power plant side, not IT-equipment cooling. …
Community. City council and mayor formally support the project; PILOT Ordinance 2026-3 adopted unanimously January 27, 2026. Approximately 100 residents rallied in opposition (noise, emissions, water, property values, health concerns). Pinelands Alliance hosted community town hall. Sierra Club and Sustain South Jersey formally oppose, citing construction without final environmental permits, proximity to Pinelands, and lack of public process. NJDEP reviewing air permit and investigating facility's emissions as a single-source with adjacent parcels.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Announced construction jobs: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
- Land area: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
What the source record says
Phase-1 (~100 MW) completed summer 2025 in approximately 20 weeks from March 2025 announcement; full campus buildout targeting November 2026. Total design capacity cited as 'up to 300 MW' in Nebius press releases (sourceRef 0); DataOne CEO and local/community coverage consistently cite 350 MW; long-term campus potential described as approaching 1 GW. Coordinates are approximate (site: South Lincoln and Sheridan Avenues, East Vineland; Baxtel lists 805 Sheridan Ave). DataOne is the developer/builder — BSO's data center unit (launched 2024) backed by Ardian; CEO Charles-Antoine Beyney; this is DataOne's first US site (previously Grenoble and Lyon, France). Nebius is the ~10-year tenant; Microsoft GPU infrastructure agreement commencing late 2025 under multi-year AI infrastructure deal. Facility is 100% privately funded; DataOne declined a $6.2M city equipment loan amid community backlash. Distinct from Nebius's Independence, MO (Kansas City) site. NJDEP air permit pending as of early 2026; construction proceeded ahead of final permit issuance. DataOne stated 200+ permanent full-time jobs; construction job count not disclosed.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-03 · source-reported proposed
Nebius and DataOne announce phased AI data center in Vineland, NJ; 20-week first-phase build target, total ceiling 'up to 300 MW'
- 2025 · source-reported operational
First phase completed in approximately 20 weeks (summer 2025); Nebius committed to 100 MW installed capacity by year-end 2025; Microsoft GPU capacity deliveries begin late 2025. Full campus buildout targeting November 2026.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Nebius accelerates US expansion, adding up to 300 MW capacity at new data center in New Jersey · Nebius
- We're introducing the 300 MW New Jersey region and expanding to Iceland · Nebius
- DataOne to build Nebius data center in New Jersey · Data Center Dynamics
- Vineland residents are protesting AI data center as concerns mount over emissions · WHYY
- A Town Hall Too Late – Vineland Data Center · Pinelands Alliance
- South Jersey's largest data center is being built in Vineland. Some residents say they've had no say in the process. · Philadelphia Inquirer
- 'Vineland data center makes case for on-site power generation during 6-hour hearing' — WHYY, 6 August 2026 · WHYY
- 'Vineland planning board approves 2nd phase of 300-megawatt data center plan' — WHYY, 18 August 2026 · WHYY
- What exactly is DataOne building in Vineland? · South Jersey Climate News
- Nebius x Vineland, New Jersey · Nebius
- City of Vineland, N.J. issues stop-work order to parts of data center · WHYY
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID nebius-vineland-nj. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001034
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- South Lincoln Avenue, Vineland, NJ · Cumberland (Approximate location)
Roles
- Operator: Nebius Group
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported operational
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 2025
Provider-reported announcement date.
- Status history: 2025-03 · source-reported proposed
Status history supplied by the source.
- Status history: 2025 · source-reported operational
Status history supplied by the source.
Power capacity
- Reported capacity: Operational: 100 MW; Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Vineland Municipal Utilities Authority (supplemental, ~15%)
Utility as named by the provider.
- Power source: On-site gas
Provider label.
Cooling, water, PUE and WUE
- Cooling: Air
Provider label.
Permits, incentives, jobs and proceedings
- Announced jobs: 200 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Community response: Provider label: mixed
Compute Atlas characterization, not a DataCenterData assessment.
- Incentive reported by the source: 5-year PILOT (Payment in Lieu of Taxes), Ordinance 2026-3 — dollar amount not publicly disclosed · City of Vineland, NJ · 2026
Whether the incentive was approved, awarded or received is not established.
- Incentive reported by the source: Five-year payment in lieu of taxes (PILOT) agreement · City of Vineland, NJ · 2026
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-21
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.