Reported planned 1,200 MWSource updated 24 August 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Nebius AI Factory (Independence).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Nebius Group
Address and locality
Independence · Jackson County · Missouri
Official metro area
Kansas City, MO-KS
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 1,200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
24 August 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001033

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Independence Power & Light (IPL)Utility as named by the provider.
Power source
MixedProvider label.
Cooling
Closed-loopProvider label.
Land area
400 acres (source-reported; parcel boundary not established)
Announced investment
$6.6 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
130 permanent · 1,200 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: litigationCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
March 2026Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • City of Independence Taxable Industrial Development Revenue Bonds (Missouri Chapter 100) · Independence, MO · 2026 Open cited source →

Provider notes

Energy. Independence Power & Light (IPL), the city's municipal utility, supplies grid power starting 2026; Independence's rebuilt Blue Valley Power Plant (natural gas, Phase 1 ~250MW) to come online October 2027, operated by Independence Power Partners (IPP); city provides contractual energy access starting 2026; on-site gas generation eventually to supply a portion of site demand

Water. Operator states closed-loop system uses water roughly comparable to a QuikTrip convenience store annually; significantly below typical open-loop data center cooling

Community. Opponents raised concerns about water usage, electricity rate impacts, and wildlife habitat; filed lawsuit seeking a city-wide vote on the project; judge dismissed the lawsuit; city council approved bonds over public objections. Groundbreaking proceeded May 13, 2026.

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • On-site generation: The source note attributes the listed generation to a separate city power plant run by another company; on-site gas generation is mentioned without a figure.

What the source record says

Nebius Group's (Nasdaq: NBIS) first gigawatt-scale US data center project. Located in Eastgate Commerce Center, off Little Blue Parkway and Missouri Highway 78 in eastern Independence. Up to 10 buildings planned. Phase 1 operational target Q2 2027; full campus completion 2028–2029. Projected $30–50M annual tax revenue for Independence. Separate Nebius facility exists at former Kansas City Star printing press building ~20 miles west (not this record). Coordinates approximate for Eastgate Commerce Center in eastern Independence. The $150.6B bond authorization is a Missouri Chapter 100 IDRB structure; bonds are privately issued and owned by Nebius — no city credit exposure.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-03 · source-reported proposed

    Nebius secures tax breaks from Independence city council in March 2026; ~$150.6B in Taxable Industrial Development Revenue Bonds (Missouri Chapter 100 structure, privately issued/owned by Nebius) approved

    Open cited source →

  2. 2026-05 · source-reported under construction

    Groundbreaking May 13, 2026; first phase of construction underway; Phase 1 operational target Q2 2027

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID nebius-independence-mo. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001033

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Independence, MO · Jackson (Approximate location)

Roles

  • Operator: Nebius Group

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: March 2026

    Provider-reported announcement date.

  • Status history: 2026-03 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-05 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 400 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 1,200 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Independence Power & Light (IPL)

    Utility as named by the provider.

  • Power source: Mixed

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $6.6 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 130 permanent · 1,200 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: litigation

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: City of Independence Taxable Industrial Development Revenue Bonds (Missouri Chapter 100) · Independence, MO · 2026

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-24

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →