This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Iron Mountain Data Centers NJE-1.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Iron Mountain
- Address and locality
- 3003 Woodbridge Avenue · Edison · Middlesex County · New Jersey
- Official metro area
- New York-Newark-Jersey City, NY-NJ
- Source-reported status
- operational
- Provider facility type
- data center
- Reported capacity
- Operational: 30 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 21 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000823
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- Mixed
- On-site generation
- 7.2 MW (source-reported)
- Land area
- 43 acres (source-reported; parcel boundary not established)
Provider notes
Energy. Operator states 100% renewable energy matching plus on-site solar via '18,000+ rooftop solar panels' (7.2 MW on-site solar generation capacity) — described as the largest such installation of any North American data center, per Iron Mountain's own site.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Cooling: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
What the source record says
TIA-942-certified, 830,000 sq ft on a 43-acre campus, 30 MW with 2N redundancy, N+1 cooling/UPS, ISO 50001/14001 certified, PUE as low as 1.2. Acquired by Iron Mountain in January 2018 as part of a $1.34B acquisition of IO Data Centers' US portfolio (which also included sites in Phoenix, Scottsdale, and Columbus, OH), per the operator's own site. Hosts 180+ customers including 20+ carriers and two IXPs. Coordinate provenance (resolved 2026-09-12): Iron Mountain's own location page embeds a Google Maps link containing TWO coordinate pairs from two different Place IDs. This record uses 40.5210834,-74.3473835 — the pair the link anchors directly to the literal address string "3003 Woodbridge Ave, Edison, NJ 08837, USA" — which sits ~29 m from the independently-mapped OpenStreetMap building tagged "IO Datacenter" at the same address. The other page-stated pair (40.5216986,-74.3461546) carries no address string and lands ~145 m away; a naive extraction returns it, since the page labels neither. Both page-stated pairs are ~1.8-1.9 km from the US Census geocoder's point for this address, which interpolates along the street centre line and is wrong here.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- New Jersey Data Center | New Jersey Colocation · Iron Mountain
- Iron Mountain Data Centers NJE-1 — 3003 Woodbridge Avenue · DataCenterHawk
- OpenStreetMap way/204316962 — IO Datacenter, 3003, Woodbridge Avenue · OpenStreetMap contributors
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID iron-mountain-nje1-edison-nj. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000823
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 3003 Woodbridge Avenue, Edison, NJ · Middlesex (Approximate location)
Roles
- Operator: Iron Mountain
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported operational
Provider status label; not a DataCenterData finding that the facility is operating.
Area, acreage and buildings
- Land area: 43 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Operational: 30 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: Mixed
Provider label.
- On-site generation: 7.2 MW (source-reported)
On-site figures often describe backup generators rather than primary supply; read the provider energy note.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-21
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.