Licensed lead · not independently verified · dcd-dir-000811

IREN Horizon — Childress, TX

source-reported under construction

IREN (Iris Energy)

Childress · Childress County · Texas

Reported planned 750 MWSource updated 25 July 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for IREN Horizon — Childress, TX.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
IREN (Iris Energy)
Address and locality
Childress · Childress County · Texas
Official metro area
Outside an official metropolitan boundary
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 750 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
25 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000811

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
ERCOTUtility as named by the provider.
Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Land area
576 acres (source-reported; parcel boundary not established)
Community response
Provider label: supportedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Iris Energy Reinvestment Zone No. 1 (Chapter 312 Texas Tax Code property-tax abatement) · Childress County, TX · 2021 Open cited source →

Provider notes

Energy. Direct 345 kV grid connection via on-site substations owned by IREN. IREN states it utilizes abundant low-cost renewable energy available on ERCOT and actively curtails consumption during high-demand periods. No on-site gas generation confirmed for this site.

Water. Direct-to-chip closed-loop liquid cooling. IREN states the system does not consume water on an ongoing basis; annual top-ups require roughly as much water as a few houses. Water is trucked in externally — deliberately not drawn from Childress municipal supply. System described as analogous to a vehicle radiator.

Community. Local leadership and community described as strongly supportive. IREN COO stated community partnership was essential to construction progress. Community Grants Program distributes $250,000 annually to Childress area. IREN committed to local hiring and contracting with local businesses where possible.

What the source record says

SEPARATE SITE from IREN Sweetwater (Nolan/Fisher County — do not conflate). Full 750 MW figure is total campus transmission capacity; the AI/Microsoft Horizon 1–4 build-out comprises four 50 MW IT (75 MW gross) liquid-cooled data halls = 200 MW IT total, targeting end-2026 delivery. Horizon 1 (50 MW IT / 75 MW gross) energized Q4 2025 — operational; Horizons 2–4 remain under construction as of mid-2026. Coordinates approximate (county seat area). Site is a 576-acre freehold parcel with on-site 345 kV substations connecting directly to ERCOT. Investment for Horizon 1–4 reported as $300–350M (range; not a firm figure — omitted from investmentUsd). Microsoft contract ($9.7B total, 5-year through ~2031) covers NVIDIA GB300 Blackwell Ultra GPU cloud services; 20% upfront prepayment funded capex. Dell Technologies hardware supply agreement: $5.8B. IREN also holds a separate NVIDIA cloud services contract at Childress. Rack density 130–200 kW per rack; projected PUE 1.05–1.10. Approximately 25 current full-time local employees, 50+ expected at 750 MW full build-out; over 500 contractors during construction phase (approximate reported figures — omitted from jobs numeric fields). IREN Community Grants Program distributes $250,000 annually to the Childress area.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025 · source-reported under construction

    Horizon 1 (75 MW gross / 50 MW IT) announced March 11, 2025; construction underway at existing Childress campus

    Open cited source →

  2. 2025 · source-reported under construction

    IREN signs $9.7B five-year Microsoft GPU cloud contract November 2025; Horizons 1–4 at Childress targeted for end-2026 full deployment

    Open cited source →

  3. 2025 · source-reported operational

    Horizon 1 (50 MW IT / 75 MW gross) energized Q4 2025 — IREN's first purpose-built AI data center; Horizons 2–4 remain under construction

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID iren-horizon-childress-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000811

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Childress, TX (Approximate location)

Roles

  • Operator: IREN (Iris Energy)

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2025

    Provider-reported announcement date.

  • Status history: 2025 · source-reported under construction

    Status history supplied by the source.

  • Status history: 2025 · source-reported under construction

    Status history supplied by the source.

  • Status history: 2025 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 576 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 750 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: ERCOT

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: supported

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Iris Energy Reinvestment Zone No. 1 (Chapter 312 Texas Tax Code property-tax abatement) · Childress County, TX · 2021

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-25

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →