Licensed lead · not independently verified · dcd-dir-000741

Google Red Oak Campus

source-reported operational

Google

Red Oak · Ellis County · Texas

Capacity not statedSource updated 7 July 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Google Red Oak Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Google
Address and locality
Red Oak · Ellis County · Texas
Official metro area
Dallas-Fort Worth-Arlington, TX
Source-reported status
operational
Provider facility type
data center
Reported capacity
Not stated
Source freshness
7 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000741
Dated source review

The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.

  • Source review · reviewed 2026-10-09: Google’s official data-center locations index lists “Red Oak, Texas.” This provides operator-and-city context only. It does not establish that the location covers this row’s particular project name, parcel, building boundaries, capacity or operating status.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Land area
166 acres (source-reported; parcel boundary not established)
Announced investment
$330 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment.
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
September 2023Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Ellis County 10-year property tax abatement (Alamo Mission LLC / Google, approved July 2018)

What the source record says

Google's second Dallas-Fort Worth campus. First building operational late 2025; second building under construction as of Nov 2025 per Mayor Stanfill. 166 acres at FM 664 (Ovilla Rd) and SH 342; shell entity Alamo Mission LLC used in Ellis County negotiations. investmentUsd records only the $330M confirmed initial investment; the frequently cited $600M+ is a multi-phase projection (in notes). Capacity in MW not publicly disclosed. Google pledged a $150,000 STEM grant to Red Oak ISD; grid reinforcements estimated ~$72M. Part of Google's broader $40B Texas commitment. Coordinates are the Red Oak town centroid (no parcel GPS confirmed). The 2018 abatement's scope vs the separate Midlothian campus is not fully disambiguated in the public record.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2018-07 · source-reported proposed

    Ellis County commissioners approved a 10-year tax abatement with Alamo Mission LLC (a Google shell entity)

    Open cited source →

  2. 2023-09 · source-reported under construction

    Google publicly announced the Red Oak campus: 166 acres at FM 664/SH 342, 285,000 sq ft first building, $330M initial investment

    Open cited source →

  3. 2025-11-14 · source-reported operational

    First building confirmed operational; second building still under construction per Mayor Mark Stanfill

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID google-red-oak-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000741

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Red Oak, TX · Ellis (Approximate location)

Roles

  • Operator: Google

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: September 2023

    Provider-reported announcement date.

  • Status history: 2018-07 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2023-09 · source-reported under construction

    Status history supplied by the source.

  • Status history: 2025-11-14 · source-reported operational

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 166 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $330 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Ellis County 10-year property tax abatement (Alamo Mission LLC / Google, approved July 2018)

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-07

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →