This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Google Red Oak Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Address and locality
- Red Oak · Ellis County · Texas
- Official metro area
- Dallas-Fort Worth-Arlington, TX
- Source-reported status
- operational
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 7 July 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000741
The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.
- Source review · reviewed 2026-10-09: Google’s official data-center locations index lists “Red Oak, Texas.” This provides operator-and-city context only. It does not establish that the location covers this row’s particular project name, parcel, building boundaries, capacity or operating status.
- Google data-center locations index; document date not stated · source retrieved 2026-10-09
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- Grid
- Cooling
- Closed-loop
- Land area
- 166 acres (source-reported; parcel boundary not established)
- Announced investment
- $330 million
- Community response
- Provider label: mixed
- AI-use label (provider)
- confirmed
- Announced
- September 2023
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Ellis County 10-year property tax abatement (Alamo Mission LLC / Google, approved July 2018)
What the source record says
Google's second Dallas-Fort Worth campus. First building operational late 2025; second building under construction as of Nov 2025 per Mayor Stanfill. 166 acres at FM 664 (Ovilla Rd) and SH 342; shell entity Alamo Mission LLC used in Ellis County negotiations. investmentUsd records only the $330M confirmed initial investment; the frequently cited $600M+ is a multi-phase projection (in notes). Capacity in MW not publicly disclosed. Google pledged a $150,000 STEM grant to Red Oak ISD; grid reinforcements estimated ~$72M. Part of Google's broader $40B Texas commitment. Coordinates are the Red Oak town centroid (no parcel GPS confirmed). The 2018 abatement's scope vs the separate Midlothian campus is not fully disambiguated in the public record.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2018-07 · source-reported proposed
Ellis County commissioners approved a 10-year tax abatement with Alamo Mission LLC (a Google shell entity)
- 2023-09 · source-reported under construction
Google publicly announced the Red Oak campus: 166 acres at FM 664/SH 342, 285,000 sq ft first building, $330M initial investment
- 2025-11-14 · source-reported operational
First building confirmed operational; second building still under construction per Mayor Mark Stanfill
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Google announces plans for Red Oak data center campus in Texas · Data Center Dynamics
- Texas - Google Data Center Location · Google
- Google plans to invest more than $600 million in a new data center · Ellis County Press
- Google announces plans to invest nearly $40 billion in Ellis County Data Centers · Ellis County Press
- Google Red Oak TX Data Center · Baxtel
- New Red Oak Data Center Project Meets Community Pushback · Dallas Observer
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID google-red-oak-tx. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000741
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Red Oak, TX · Ellis (Approximate location)
Roles
- Operator: Google
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported operational
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: September 2023
Provider-reported announcement date.
- Status history: 2018-07 · source-reported proposed
Status history supplied by the source.
- Status history: 2023-09 · source-reported under construction
Status history supplied by the source.
- Status history: 2025-11-14 · source-reported operational
Status history supplied by the source.
Area, acreage and buildings
- Land area: 166 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Closed-loop
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $330 million
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Community response: Provider label: mixed
Compute Atlas characterization, not a DataCenterData assessment.
- Incentive reported by the source: Ellis County 10-year property tax abatement (Alamo Mission LLC / Google, approved July 2018)
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-07-07
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.