Licensed lead · not independently verified · dcd-dir-000739

Google Pryor Data Center Campus (Mayes County Expansion)

source-reported operational

Google

Pryor · Mayes County · Oklahoma

Capacity not statedSource updated 14 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Google Pryor Data Center Campus (Mayes County Expansion).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Google
Address and locality
Pryor · Mayes County · Oklahoma
Official metro area
Outside an official metropolitan boundary
Source-reported status
operational
Provider facility type
data center
Reported capacity
Not stated
Source freshness
14 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000739
Dated source review

The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.

  • Source review · reviewed 2026-10-09: Google’s official data-center locations index lists “Pryor, Mayes County, Oklahoma.” This provides operator-and-city context only. It does not establish that the location covers this row’s particular project name, parcel, building boundaries, capacity or operating status.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Grand River Dam Authority (GRDA)Utility as named by the provider.
Power source
GridProvider label.
Cooling
EvaporativeProvider label.
Reported water use
3 million gallons per day (source-reported)Whether this is metered use, a permit limit or a request is not established; see the provider water note.
Announced investment
$4.4 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
mixed useCompute Atlas classification, not a DataCenterData finding.
Announced
January 2007Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Oklahoma ad valorem manufacturing exemption (5-year property-tax exemption on data-center equipment) — $45.9M in 2021 alone (largest single-year benefit; amountUsd reflects this 2021 figure); ~$239M reimbursed cumulatively over ~a decade for the Mayes County facility; existing qualifying equipment retains the exemption to 2036 under SB 609 (2021) · Mayes County, OK · 2021 · $45.9 million (as stated) Open cited source →

Provider notes

Energy. Google's second-largest data center campus in the world. Oklahoma wind generates ~42% of in-state electricity. New expansion announced as part of $9B Oklahoma investment (August 2025). Google has invested $5.7B+ in Oklahoma historically (prior to August 2025 $9B commitment).

Water. Utility records (open-records request) show the Pryor center used more than 1.1 billion gallons Jul 2024–Jun 2025 (≈3.0 MGD, a floor) from the Neosho River via the state-owned MidAmerica Industrial Park; ~253M gallons were discharged back to the river, the remainder lost to evaporative cooling. Google was the park's second-largest water user that year.

Community. Strong official support — Pryor Mayor Zac Doyle: Google has brought "hundreds of jobs, economic growth, and billions in investment" and supports local schools and nonprofits. Google reports more than 800 jobs created to date in Pryor and $4.4 billion invested in Mayes County to date (company-provided figures via The Frontier). Grassroots and state-level concerns are documented: local hiring practices, rising housing costs, and heavy water use (>1.1B gal/yr); the Oklahoma Water Resources Board warned (Oct 2025) that data centers "will contribute to the strain" on water supply. …

What the source record says

Campus operational since 2011; Google's second-largest data center globally per Alphabet CIO Ruth Porat. Four expansions now underway. $5.7B+ invested historically in Oklahoma prior to August 2025 $9B commitment. Expansion capacity and MW not publicly specified. Coordinates are Pryor city center.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2011-01 · source-reported operational

    Campus opens in Mayes County after first announcement in 2007. Has undergone three expansions since opening.

    Open cited source →

  2. 2025-08 · source-reported operational

    New expansion announced as part of Google's $9B, two-year Oklahoma investment commitment.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID google-pryor-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000739

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): mixed use

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Pryor, OK · Mayes (Approximate location)

Roles

  • Operator: Google

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: January 2007

    Provider-reported announcement date.

  • Status history: 2011-01 · source-reported operational

    Status history supplied by the source.

  • Status history: 2025-08 · source-reported operational

    Status history supplied by the source.

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Grand River Dam Authority (GRDA)

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Evaporative

    Provider label.

  • Reported water use: 3 million gallons per day (source-reported)

    Whether this is metered use, a permit limit or a request is not established; see the provider water note.

Permits, incentives, jobs and proceedings

  • Announced investment: $4.4 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Oklahoma ad valorem manufacturing exemption (5-year property-tax exemption on data-center equipment) — $45.9M in 2021 alone (largest single-year benefit; amountUsd reflects this 2021 figure); ~$239M reimbursed cumulatively over ~a decade for the Mayes County facility; existing qualifying equipment retains the exemption to 2036 under SB 609 (2021) · Mayes County, OK · 2021 · $45.9 million (as stated)

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-14

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →