Google Nebraska AI Campus (proposed)

source-reported proposed

Google

Otoe County · Nebraska

Reported planned 1,000 MWSource updated 16 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Google Nebraska AI Campus (proposed).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Google
Address and locality
Otoe County · Nebraska
Official metro area
Outside an official metropolitan boundary
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
16 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000728

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
On-site gasProvider label.
Cooling
Not establishedThe provider reports water information but no cooling type.
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
March 2026Provider-reported announcement date.

Provider notes

Energy. Tenaska (Omaha-based) to build and operate a privately owned combined-cycle natural gas plant; capacity potentially exceeding twice Nebraska's largest existing plant (1,365 MW Gerald Gentleman Station); carbon capture technology planned; Tallgrass Energy potentially to supply gas and transport captured CO2 (Tallgrass later denied involvement); project contingent on passage of Nebraska LB1261 permitting private generators to interconnect with public utility grids On-site generation is not stated in the cited sources. …

Water. Cooling technology not disclosed in public filings. County officials and residents have raised concerns about combined water demand from the proposed data center and its associated natural-gas power plant.

Community. Otoe County commissioners passed a one-year moratorium on new data-center permits (May 2026), with the board chair describing sentiment as '50/50'; the Gage County planning commission unanimously recommended an 18-month moratorium (June 2026) to applause. Opposition centers on water supply, power costs, land use, and limited permanent employment.

What the source record says

Exact site is unknown and undisclosed. Tenaska has optioned over 2,600 acres across Gage, Lancaster, Otoe, and Cass Counties in SE Nebraska since December 2025. Coordinates are approximate centroid of the Otoe/Gage County search area. Reported capacity range is 1,000–3,000 MW depending on phase; 1,000 MW used as minimum. Google has invested $3.5B in Nebraska since 2019 across existing Papillion, Omaha, and Lincoln data centers. Legislative feasibility depends on LB1261; could be operational by 2029 if approved.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-03 · source-reported proposed

    Project leaked via documents from a Nebraska public power district meeting in January 2026; Flatwater Free Press and Grist reported in March 2026; Google and Tenaska declined comment; neither has officially confirmed

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID google-nebraska-ai-campus-proposed. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000728

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • NE · Otoe (Approximate location)

Roles

  • Operator: Google

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: March 2026

    Provider-reported announcement date.

  • Status history: 2026-03 · source-reported proposed

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 1,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: On-site gas

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-16

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →