This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Google Montgomery County Data Center.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Address and locality
- 1000 Boolean Drive · Clarksville · Montgomery County · Tennessee
- Official metro area
- Clarksville, TN-KY
- Source-reported status
- operational
- Provider facility type
- data center
- Reported capacity
- Not stated
- Source freshness
- 21 September 2026
- Location precision
- approximate (provider label: exact; the provider's own note describes an approximate location)
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000726
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- TVA
- Power source
- Grid
- Land area
- 1,300 acres (source-reported; parcel boundary not established)
- Announced investment
- $600 million
- Announced jobs
- 70 permanent
- AI-use label (provider)
- mixed use
- Announced
- 2015
Provider notes
Energy. Power usage matched 100% with renewable energy through TVA deal
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Incentives: Previously held pending provider-field review. The concern has not been resolved by an independent source review for this captured edition; the field remains withheld.
What the source record says
Address: 1000 Boolean Dr, Clarksville, TN 37040 (former Hemlock Semiconductor site). Coordinates are approximate for that site. Google reports $2.5B+ total Tennessee investment since 2018 but facility-level investment is $600M. 30% veteran workforce. Correction: Original announcement was December 2015 (not 2018); facility opened November 2019 (not 2022).
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2015 · source-reported proposed
Governor Haslam and TNECD announce Google to locate new data center in Clarksville, December 22, 2015
- 2018 · source-reported under construction
Google CEO Sundar Pichai breaks ground on former Hemlock Semiconductor site on Boolean Dr, February 2018
- 2019 · source-reported operational
Google officially opens $600M Montgomery County data center; ribbon-cutting ceremony November 6, 2019
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Governor Haslam Announces Google to Locate New Data Center in Clarksville · Tennessee Department of Economic & Community Development
- Google officially opens Clarksville-Montgomery County data center · ClarksvilleNow
- Google Data Centers: Montgomery County, Tennessee (official) · Google
- OpenStreetMap way 708931343 — 'Google Montgomery Data Center', operator=Google LLC, addr 1000 Boolean Drive, Clarksville · OpenStreetMap contributors
- Google's secrecy agreement with the Montgomery County IDB should be undone (Tennessee Coalition for Open Government, Sept 30, 2018) — Dec 22, 2015 PILOT agreement terms · Tennessee Coalition for Open Government
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID google-montgomery-county-tn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000726
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): mixed use
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- 1000 Boolean Drive, Clarksville, TN · Montgomery (Approximate location)
Roles
- Operator: Google
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported operational
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 2015
Provider-reported announcement date.
- Status history: 2015 · source-reported proposed
Status history supplied by the source.
- Status history: 2018 · source-reported under construction
Status history supplied by the source.
- Status history: 2019 · source-reported operational
Status history supplied by the source.
Area, acreage and buildings
- Land area: 1,300 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Not stated
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: TVA
Utility as named by the provider.
- Power source: Grid
Provider label.
Permits, incentives, jobs and proceedings
- Announced investment: $600 million
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 70 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-21
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.