Licensed lead · not independently verified · dcd-dir-000522

ECL CSC-1 FlexGrid AI Data Center

source-reported proposed

ECL

Santa Clara · Santa Clara County · California

Reported planned 35 MWSource updated 29 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for ECL CSC-1 FlexGrid AI Data Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
ECL
Address and locality
Santa Clara · Santa Clara County · California
Official metro area
San Jose-Sunnyvale-Santa Clara, CA
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 35 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
29 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000522

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Silicon Valley Power (SVP)Utility as named by the provider.
Power source
MixedProvider label.
Cooling
Closed-loopProvider label.
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
April 2026Provider-reported announcement date.

Provider notes

Energy. FlexGrid architecture combines SVP on-grid electricity with natural gas and hydrogen fuel cells behind the meter, bypassing SVP grid interconnection queue constraints. Sub-1.15 PUE target. Rack densities 75-270kW for AI high-density compute.

Water. When hydrogen fuel cells are used, by-product water from hydrogen generation supplies the cooling loop, eliminating freshwater draw — significant for drought-prone California.

What the source record says

Exact street address not publicly disclosed. Coordinates are Santa Clara city centroid (approximate). Announced April 21, 2026. First phase targets Q4 2026 delivery. ECL CEO Yuval Bachar stated the project addresses SVP grid capacity constraints that have forced other data center developers into multi-year interconnection queues. Project targets AI training and inference workloads.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-04 · source-reported proposed

    ECL publicly announced CSC-1, a 35MW FlexGrid-powered AI data center in Santa Clara; first phase delivery targeted Q4 2026

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID ecl-csc1-santa-clara-ca. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000522

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Santa Clara, CA (Approximate location)

Roles

  • Operator: ECL

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: April 2026

    Provider-reported announcement date.

  • Status history: 2026-04 · source-reported proposed

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 35 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Silicon Valley Power (SVP)

    Utility as named by the provider.

  • Power source: Mixed

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-29

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →