Crane PDX01

source-reported under construction

Crane Data Centers

Forest Grove · Washington County · Oregon

Reported planned 76 MWSource updated 8 July 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Crane PDX01.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Crane Data Centers
Address and locality
Forest Grove · Washington County · Oregon
Official metro area
Portland-Vancouver-Hillsboro, OR-WA
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 76 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
8 July 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000341

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Forest Grove Light & PowerUtility as named by the provider.
Power source
GridProvider label.
Cooling
AirProvider label.
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.

Provider notes

Energy. Served by Forest Grove Light & Power (municipal), which purchases ~90% of its power from the Bonneville Power Administration (hydro-dominant); Crane built a developer-funded on-site 115 kV substation (no on-site generation).

Water. Phase 1 confirmed air-based cooling (City Community Development Director; Crane CEO): the company 'has not applied to use water cooling for its first building ... will rely on air-based cooling, limiting water consumption to typical plumbing needs.' A 2023 release mentioned recycled water for cooling (likely a later phase).

Community. Two-round appeal fight: planning staff approved (July 2024); a resident appeal was denied by the Planning Commission (4-2, Sept 3, 2024); a further appeal was denied by City Council (5-0, Oct 14, 2024). Opposition centered on building scale (~75 ft), shadowing of homes, wetlands/habitat, and grid strain. The project prevailed; no lawsuit found.

What the source record says

PDX01 data center campus in Forest Grove, Washington County; 76 MW by 2026. Coordinates are the Forest Grove area centroid. Development cost not disclosed (partner: Principal Asset Management) -> investmentUsd omitted. No job counts disclosed -> jobs honest-zero. Crane markets property-tax / enterprise-zone incentives, but no signed agreement is on record (statewide Oregon EZ moratorium eff. June 2026) -> subsidy honest-zero.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026 · source-reported under construction

    Forest Grove planning commission greenlit Crane's PDX01 campus (76 MW by 2026), Washington County

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID crane-pdx01-forest-grove-or. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000341

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Forest Grove, OR · Washington (Approximate location)

Roles

  • Operator: Crane Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 76 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Forest Grove Light & Power

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Air

    Provider label.

Permits, incentives, jobs and proceedings

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-07-08

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →