Licensed lead · not independently verified · dcd-dir-000015

5C MEM01 Memphis (former Fred's headquarters)

source-reported operational

5C Data Centers

4300 Getwell Road · Memphis · Shelby County · Tennessee · 38118

Reported planned 15 MWReported operational 20 MWSource updated 11 October 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for 5C MEM01 Memphis (former Fred's headquarters).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
5C Data Centers
Address and locality
4300 Getwell Road · Memphis · Shelby County · Tennessee · 38118
Official metro area
Memphis, TN-MS-AR
Source-reported status
operational
Provider facility type
data center
Reported capacity
Operational: 20 MW; Planned: 15 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
11 October 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000015
Dated source review

The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.

  • status: The added history reports partial operation; older narrative text predates that update and should not be read as current status evidence.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Announced investment
$152 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
15 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
AI-use label (provider)
mixed useCompute Atlas classification, not a DataCenterData finding.

Provider notes

Energy. 5C's facility table lists the Memphis site's power source as 'GRID BTM' and shows 20 MW for 2026 with 64 MW in 2027 and a further 35 MW in 2029+; FOX13 reported 20 MW current capacity with a 35 MW planned expansion

Some source-reported values are held out of this page.

These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.

  • Land area: The source note says the 59-acre figure is for the whole former Fred’s headquarters property, not the data-center footprint.

What the source record says

Conversion of the former Fred's discount-retail headquarters, a multi-storey warehouse and office complex bought by Olymbec in 2019. DCD (2025-05-06), citing WREG, reports plans were submitted to Shelby County in late 2024 to convert 4300 Getwell Road into a data center supporting an initial 15MW IT load in phase one; the 15 MW phase-one figure is what is recorded as planned capacity. 5C's own site separately listed a Memphis facility, MEM01, at 20MW in 2025 and 60MW from 2027 — those larger figures are second-hand in this source and are deliberately NOT recorded as capacity. The 965,000 sq ft / 59-acre complex figures are Olymbec's, for the whole property, not for the data-center footprint. Quebec firms Adag Group and Hypertec are involved; 5C was subsequently acquired by Hypertec. Status is proposed and confidence reported: no source fetched here confirms permit issuance or construction start. Separately, Memphis City Council members led by JB Smiley Jr. introduced a proposed ordinance on 2026-08-16 for a temporary moratorium on new data-center developments citywide, which is context for this site but is not stated to apply to it.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-09-14 · source-reported under construction

    Construction is under way rather than merely proposed: 5C MEM01 LLC closed on the former Fred's headquarters for $25 million (deed of record), and drone footage in January 2026 captured ongoing construction on the rear of the building including what appeared to be turbines.

    Open cited source →

  2. 2026-10-10 · source-reported operational

    Daily Memphian (2026-09-03) reports '5C is now operating in 200,000 square feet' of the former Fred's headquarters on Getwell Road. That is a partial operating start, with room to expand.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID 5c-mem01-memphis-tn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000015

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): mixed use

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • 4300 Getwell Road, Memphis, TN 38118 · Shelby (Approximate location)

Roles

  • Operator: 5C Data Centers

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported operational

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Status history: 2026-09-14 · source-reported under construction

    Status history supplied by the source.

  • Status history: 2026-10-10 · source-reported operational

    Status history supplied by the source.

Power capacity

  • Reported capacity: Operational: 20 MW; Planned: 15 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Permits, incentives, jobs and proceedings

  • Announced investment: $152 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 15 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-11

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →