Exact operator label · licensed discovery layer
Digi Power X data centers: 1 listing with status and map
1 listing from a licensed directory under the exact operator label “Digi Power X”, with location and stated status. Names are not merged into parent companies or ownership groups.
Discovery boundary: operator names are exact published strings and are not resolved corporate identities. Rows have not been independently verified by DataCenterData.
Reported geography
1 reported Digi Power X facility point.
Points belong only to rows carrying the exact published operator label “Digi Power X”. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Showing 1–1 of 1 rows.
-
Digi Power X Columbiana AI Data Center
130 Industrial Parkway · Columbiana · Shelby County · Alabama
source-reported under constructionReported planned 40 MWSource updated 22 September 2026approximate location
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).