This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Digi Power X Columbiana AI Data Center.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Digi Power X
- Address and locality
- 130 Industrial Parkway · Columbiana · Shelby County · Alabama
- Official metro area
- Birmingham, AL
- Source-reported status
- under construction
- Provider facility type
- data center
- Reported capacity
- Planned: 40 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 22 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000447
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Electric utility
- Alabama Power
- Power source
- Grid
- Cooling
- Not established
- Announced investment
- $371.5 million
- Announced jobs
- 45 permanent
- Community response
- Provider label: contested
- AI-use label (provider)
- confirmed
- Announced
- January 2025
Provider notes
Energy. "Digi Power X has an agreement with Alabama Power for the facility and plans to build out in two phases, with Phase 1 comprising 15 megawatts of information technology load and Phase 2 delivering 25 MW for a combined total of 40 MW." The article adds that "The property already supported 22 MW through a substation that was left over from the operation of the Grede Foundry."
Water. The abatement filing states only that "the site will utilize water for liquid cooling" and that noise will come from cooling equipment. The source does not state whether the water circuit recirculates or how heat is rejected, so coolingType is deliberately left unknown rather than guessed.
Community. "Since its announcement, residents have expressed disapproval for the data center leading to a town hall in January 2026 that answered questions regarding the facility. In February, the Columbiana City Council approved an ordinance placing restrictions on any future data centers." The City Council then "unanimously rejected a tax abatement proposal for Digi Power X" following the 5 May 2026 Cerebras announcement.
These reviews flag conflicting scope, inconsistent source text or support that has not been established. A withheld value may appear in the explanation, but is not displayed as an established field. The upstream row remains attributed under Sources.
- Announced construction jobs: The source note says the 2 recorded as construction jobs is the year-one headcount, not a construction workforce; the source states no construction-worker count.
What the source record says
SUBSIDY — AUDITED-STYLE NEGATIVE: the Columbiana City Council "unanimously rejected a tax abatement proposal for Digi Power X", and the article states "The only governmental body that has the jurisdiction to give an abatement on taxes for the Columbiana data center is the City Council." So as of 29 May 2026 this site has NO local tax abatement, and by the reporter's account no other body could have granted one. Digi Power X had requested abatement on "all state and local non-educational property taxes on the project's industrial development property" plus construction-related transaction taxes through 2027. A further abatement proposal may come before the council later. ANCHOR TENANT: 10-year master services agreement with Cerebras Systems for colocation of the 40 MW AI data center, "valued at approximately $1.1 billion with potential for the contract value to reach $2.5 billion, inclusive of renewal terms" — that $1.1B is CONTRACT VALUE, not capital investment, and is deliberately not recorded as investmentUsd; the $371.5M figure is the stated "total investment ... in building, machinery and personal property" from the abatement filing. JOBS: "Digi Power X plans to start out with two jobs at a total annual payroll of $200,000 and to expand to 45 permanent jobs by year three with a total payroll of $4.5 million" — the 2 recorded under jobs.construction is actually the year-one headcount, not a construction workforce; the source states no construction-worker count. SITE HISTORY: property purchased by Digihost Technology Inc from Grede II LLC on 21 June 2022 after the Grede Foundry closed in 2020, and run as a bitcoin-mining operation until the January 2025 conversion announcement. Air emissions to be monitored by ADEM. Coordinates are the OSM industrial-park polygon centroid for Industrial Parkway, not a confirmed parcel footprint.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-01 · source-reported proposed
Digihost/Digi Power X announced the former Grede Foundry site, in use as a bitcoin-mining operation since 2022, would be converted to a data center.
- 2026-05 · source-reported under construction
"construction on the Columbiana facility is set to begin in May 2026 and be completed by March 2027 for service to begin in April 2027"
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Columbiana data center signs $1B agreement, future plans revealed (29 May 2026) · Shelby County Reporter
- Nominatim geocode of 130 Industrial Parkway, Columbiana AL 35051 (Shelby County) — resolves to OSM way 471834867, landuse=industrial "Industrial Parkway" · OpenStreetMap / Nominatim
- Digi Power X Inc. 8-K Exhibit 99.1 — AI colocation agreement for a 40 MW Columbiana, Alabama data center · U.S. Securities and Exchange Commission (EDGAR)
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID digi-power-x-columbiana-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000447
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- 130 Industrial Parkway, Columbiana, AL · Shelby (Approximate location)
Roles
- Operator: Digi Power X
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported under construction
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: January 2025
Provider-reported announcement date.
- Status history: 2025-01 · source-reported proposed
Status history supplied by the source.
- Status history: 2026-05 · source-reported under construction
Status history supplied by the source.
Power capacity
- Reported capacity: Planned: 40 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Electric utility: Alabama Power
Utility as named by the provider.
- Power source: Grid
Provider label.
Cooling, water, PUE and WUE
- Cooling: Not established
Provider label: unknown.
Permits, incentives, jobs and proceedings
- Announced investment: $371.5 million
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
- Announced jobs: 45 permanent
Announced figures; whether they cover one building, a campus or a multi-phase program is not established.
- Community response: Provider label: contested
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-22
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.