Facts at a glance
- Record ID
project-jupiter-santa-teresa- Record type
- campus
- Evidence confidence
- high
DataCenterData’s confidence in this record’s sourced fields, not in the project - Developer
- STACK Infrastructure and BorderPlex Digital Assets
- Operator
- Not named in the cited records
- Owner
- Owner of record not established
- Tenant
- Not named in the cited records
- Capacity
- 2.462 GW Planned on-site generation · site scope
Requested YGI Microgrid generation in a pending air-permit application; not critical IT load, utility demand or issued capacity. The environment department says the applicant amended its application on 16 October 2026; whether this figure changed was not established. - Location
- Doña Ana County, NM
Approximate location — Santa Teresa Industrial Park in unincorporated Doña Ana County; no primary-source parcel or campus coordinate established. - Physical scale
- Four anticipated data-center facilities in Ordinance 367-2025.
What the sources support
Doña Ana County's April 14, 2026 update describes the data-center campus as under construction in the Santa Teresa Industrial Park. No reviewed source establishes operation. The county page could not be re-read on 3 November 2026, so this was not rechecked.
Definitions: record units · roles · capacity boundaries · lifecycle stages.
What remains unknown
- street address
- parcel
- owner
- operator
- critical IT capacity
- utility service capacity
- issued microgrid permit
- whether the 16 October 2026 application revision changed the requested generation
- written rulings on the motions to dismiss
Sources
-
Doña Ana County Ordinance No. 367-2025 →Gov. record
Exact location Recorded p. 1, lines 5-25; Instrument 2520581
What it supports Project identity, county and four anticipated facilities.
-
Doña Ana County Project Jupiter update →Gov. record
Exact location Opening project-description paragraph
What it supports Construction status and Santa Teresa Industrial Park location.
-
NMED amended hearing notice, AQB 26-57(P), NSR 10883 →Gov. record
Exact location p. 1, Brief Description of Permit Application
What it supports Related microgrid applicant, proposed generation capacity and location; not an issued permit.
-
Second Amended Scheduling Order, AQB 26-57(P), NSR 10883 →Gov. record
Exact location Hearing date and place; written testimony and motion deadlines
What it supports Public hearing set to begin 7 December 2026, in a proceeding on a permit that has not been issued.
-
NMED motion for correction of the hearing record, AQB 26-57(P), captioned NSR 10833 →Gov. record
Exact location Introduction and the passages on the stay, the 16 October amendment and the 23 November decision deadline
What it supports The environment department's own account of the stay, the application amendment and the decision deadline. It is one party's filing, and its caption prints NSR 10833 where hearing orders print NSR 10883.
Related claims
Connected records
Each connection below is a stored, reviewed relationship with its own basis. It does not change this record’s status.
Metro area: Las Cruces, NM
Policy records
- Doña Ana County: Project Jupiter industrial revenue bond authorization
Not established: Whether the policy governs, approves or restricts this project beyond what the shared document itself states.
Record history
Record history · 22 September 2025 · DataCenterData review
project-jupiter-santa-teresa → Record
Why County recorded Ordinance 367-2025.
Evidence No additional evidence link; see the linked record or claim.
Record history · 14 April 2026 · DataCenterData review
project-jupiter-santa-teresa → Record
Why County described the campus as under construction.
Evidence No additional evidence link; see the linked record or claim.
Record history · 12 August 2026 · DataCenterData review
project-jupiter-santa-teresa → Record
Why NMED noticed a hearing on the pending 2,462 MW generation application.
Evidence No additional evidence link; see the linked record or claim.
Record history · 23 August 2026 · DataCenterData review
project-jupiter-santa-teresa → Record
Why The environment department says the New Mexico Supreme Court stayed the permit proceeding on this date and lifted the stay on 17 September.
Evidence No additional evidence link; see the linked record or claim.
Record history · 16 October 2026 · DataCenterData review
project-jupiter-santa-teresa → Record
Why The environment department says the applicant amended its application on 16 October 2026. A scheduling order set the hearing to begin 7 December 2026, replacing the 14 September date in the August notice.
Evidence No additional evidence link; see the linked record or claim.
Record history · 3 November 2026 · DataCenterData review
project-jupiter-santa-teresa → Review
Field Review
Why State docket read through its 30 October filing; the permit stays pending. The environment department says state law requires a decision by 23 November unless the applicant waives that deadline, and the documents read do not settle how that fits a hearing on 7 December.
Evidence No additional evidence link; see the linked record or claim.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Reviewed record project-jupiter-santa-teresa
Campus.
Location and precision
- Shown above in Facts at a glance.
Roles
- Shown above in Facts at a glance.
Lifecycle
- Recorded status: construction
Area, acreage and buildings
- Shown above in Facts at a glance.
Power capacity
- Shown above in Facts at a glance.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.
Data + actions
Permanent link for citing this record →
Suggest a correction → Record ID project-jupiter-santa-teresa and the page are prefilled. Accepted material corrections appear on Changes.