building · Limestone, Maine · fac-002480

Eternal Mind Loring Data Center Building

Reviewed (DCD) lifecycle: proposedEvidence: reviewedSources: 1 layer

Street address not established. This facility is known only at city or county level, so the page is excluded from search indexing until a street address or coordinate source is admitted. It is still counted and listed.

This page joins every source layer DataCenterData holds for one site unit. Each value says which layer stated it and when. Layers are shown side by side and never reconciled into one status; capacities of different kinds are never added together.

DataCenterData reviewed record

building · ME · last checked 14 September 2026

Lifecycle label: proposed; effective date not establishedStatus evidence: Loring Development Authority FY2023 tenant report and June 21, 2023 board minutes reporting a nine-year data-center-building leaseEvidence: Independently source-linkedReuse: Reference only

Facts at a glance

Record ID
eternal-mind-loring-data-center-me
Record type
building
Evidence confidence
high
DataCenterData’s confidence in this record’s sourced fields, not in the project
Developer
Not named in the cited records
Operator
Not named in the cited records
Owner
Owner of record not established
Tenant
Eternal Mind, Inc.
Capacity
Unknown No independently supported figure
No selected qualifying record states critical-IT, gross-facility, utility-request, utility-service, generation, company-design or measured-load MW. The 8,000-square-foot building figure is physical scale, not capacity.
Location
Limestone, ME
Approximate location — Bounded only to Loring Commerce Centre in Limestone, Maine. The 154 Development Drive address in the June 2023 document is the board-meeting location, not the data-center building. No building number, street address, parcel, coordinate, or county field is asserted.
Physical scale
LDA board minutes describe one 8,000-square-foot Data Center building. This is a reported building area, not white space, commissioned compute area, occupied area, campus area, parcel area, building count beyond this one record, or MW capacity.

What the sources support

The Loring Development Authority of Maine's FY2023 annual report lists Eternal Mind, Inc. in its Loring Commerce Centre tenant attachment and describes it as an AI quantum-computing company. LDA's June 21, 2023 board minutes report, as a Green 4 Maine accomplishment, a nine-year lease with Eternal Mind for the 8,000-square-foot Data Center building. This supports one lease/tenant-backed proposed building on dated public-authority records. It does not establish that the lease remains in force today, the lease start or end dates, regulatory approval, construction, commissioning, current occupancy, energization, or operation. The later FY2024 tenant attachment omits Eternal Mind but expressly warns that it may not list all subtenants of third-party owners such as Green 4 Maine; the omission therefore neither proves continued tenancy nor termination.

Definitions: record units · roles · capacity boundaries · lifecycle stages.

What remains unknown

  • executed lease text, commencement date, expiration date, amendments and current performance
  • current tenancy, occupancy and operating status after FY2023
  • building number, street address, parcel, coordinates and county field
  • property owner and any relationship to the Green 4 Maine property transaction
  • developer and operator
  • critical-IT, gross-facility, utility-service, utility-request, generation and measured-load capacity
  • white-space or commissioned-compute area
  • permits, construction, commissioning, energization and opening evidence

Sources

  • Loring Development Authority of Maine — 2023 Annual Report →Gov. recordgovernment · retrieved 2026-09-14

    Exact location Printed p. 11, attachment 'Loring Commerce Centre Tenants,' Eternal Mind entry

    What it supports Eternal Mind tenant identity, AI quantum-computing description and Loring Commerce Centre crosswalk; not building address, size, capacity, operator or current operation.

  • Loring Development Authority of Maine board minutes — June 21, 2023 →Gov. recordgovernment · published 21 June 2023 · retrieved 2026-09-14

    Exact location Printed p. 3, section 7 President's Report, Green 4 Maine update

    What it supports Reported nine-year lease with Eternal Mind and one 8,000-square-foot Data Center building; not lease dates, address, owner, operation, capacity, permit, construction or commissioning.

  • Loring Development Authority of Maine — 2024 Annual Report →Gov. recordgovernment · published 4 June 2026 · retrieved 2026-09-14

    Exact location Printed p. 8, Green 4 Maine transaction; printed pp. 16–18, tenant attachment and completeness caveat

    What it supports Ownership-role caution and warning that the tenant list may omit Green 4 Maine subtenants; Eternal Mind's omission is not affirmative current-status evidence.

Record history

Record history · 21 June 2023 · DataCenterData review

eternal-mind-loring-data-center-me → Record

Why LDA board minutes reported a nine-year lease with Eternal Mind for an 8,000-square-foot Data Center building; lease commencement and expiration dates were not supplied.

Evidence No additional evidence link; see the linked record or claim.

DataCenterData record added · 14 September 2026 · DataCenterData review

eternal-mind-loring-data-center-me → Publication

Why Qualified as one proposed building from dated lease and tenant records; current tenancy, occupancy and operation remain unknown.

Evidence No additional evidence link; see the linked record or claim.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Reviewed record eternal-mind-loring-data-center-me

Building. Independently reviewed record. Values are shown with their recorded basis.

Location and precision

  • Shown above in Facts at a glance.

Roles

  • Shown above in Facts at a glance.

Lifecycle

  • Recorded status: proposed

Area, acreage and buildings

  • Shown above in Facts at a glance.

Power capacity

  • Capacity — Not yet recorded here. Recorded reason: No selected qualifying record states critical-IT, gross-facility, utility-request, utility-service, generation, company-design or measured-load MW. The 8,000-square-foot building figure is physical scale, not capacity.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Data + actions

Permanent link for citing this record →

Suggest a correction → Record ID eternal-mind-loring-data-center-me and the page are prefilled. Accepted material corrections appear on Changes.

Identity

Facility ID
dcd-fac-002480 (public id fac-002480)
Unit
building
Name source
Eternal Mind Loring Data Center Building · DataCenterData reviewed record eternal-mind-loring-data-center-me
Evidence tier
reviewed

Other names

Operators and presences

1 statement(s) naming an operator or presence at this site unit, one row per source. A building with several tenants is one facility with several presence rows.

No operator of record: no reviewed DataCenterData record names one. Each row says only what its source stated.

Operator as statedRoleUnitStated byDate
Eternal Mind, Inc.tenantbuildingDataCenterData reviewed record eternal-mind-loring-data-center-me

Status by layer

LayerValueDateSource
Reviewed (DCD) · verified recordproposed
Status basis: The Loring Development Authority of Maine's FY2023 annual report lists Eternal Mind, Inc. in its Loring Commerce Centre tenant attachment and describes it as an AI quantum-computing company. LDA's June 21, 2023 board minutes report, as a Green 4 Maine accomplishment, a nine-year lease with Eternal Mind for the 8,000-square-foot Data Center building. This supports one lease/tenant-backed proposed building on dated public-authority records. It does not establish that the lease remains in force today, the lease start or end dates, regulatory approval, construction, commissioning, current occupancy, energization, or operation. The later FY2024 tenant attachment omits Eternal Mind but expressly warns that it may not list all subtenants of third-party owners such as Green 4 Maine; the omission therefore neither proves continued tenancy nor termination.
Latest source retrieval/capture date DataCenterData reviewed record eternal-mind-loring-data-center-me

Location

City
Limestone
State
Maine

Coordinates not published; precision is city-level.

Address as published by DataCenterData reviewed record eternal-mind-loring-data-center-me. No member source publishes a street address for this facility.

Facts

Quote-bound facts: each shows the value, the source address, the capture hash (first 12 characters; the full SHA-256 is in the page markup) and the capture date. The source's exact wording stays in the capture record and is not republished here; the capture hash binds it.

No quote-bound fact with a hashed capture is recorded for this facility.

Other values by layer

FieldValueLayer and basisDateSource
physical scaleLDA board minutes describe one 8,000-square-foot Data Center building. This is a reported building area, not white space, commissioned compute area, occupied area, campus area, parcel area, building count beyond this one record, or MW capacity.Reviewed (DCD) · reviewed recordLatest source retrieval/capture date date not statedDataCenterData reviewed record eternal-mind-loring-data-center-me

Sources for the reviewed record

These citations belong to the linked reviewed records. They do not establish every figure or present-day operating status. Publication and retrieval dates are shown separately; an unstated date remains unknown.

Details still needed

34 fields in the shared profile are not established for this record. Each states why; missing information does not mean zero or absence.

  • Street address · not recorded for this field in the register
  • County · not recorded for this field in the register
  • Postal code · not recorded for this field in the register
  • Metropolitan area · not recorded for this field in the register
  • Coordinates · not recorded for this field in the register
  • Map location precision · not recorded for this field in the register
  • Provider-reported status · not recorded for this field in the register
  • Operator-stated status · not recorded for this field in the register
  • Status in public records · not recorded for this field in the register
  • Critical IT capacity (MW) · not recorded for this field in the register
  • Utility capacity (MW) · not recorded for this field in the register
  • Requested utility capacity (MW) · not recorded for this field in the register
  • Reported total power (MW) · not recorded for this field in the register
  • Generation capacity (MW) · not recorded for this field in the register
  • Company-announced design capacity (MW) · not recorded for this field in the register
  • Provider-reported capacity (MW) · not recorded for this field in the register
  • Floor area (sq ft) · not recorded for this field in the register
  • Data hall or IT floor area (sq ft) · not recorded for this field in the register
  • Site area · not recorded for this field in the register
  • Cooling redundancy · not recorded for this field in the register
  • UPS redundancy · not recorded for this field in the register
  • Backup generator redundancy · not recorded for this field in the register
  • Tier design rating · not recorded for this field in the register
  • Cooling technology · not recorded for this field in the register
  • Opening year or expected opening year · not recorded for this field in the register
  • Network presence · not recorded for this field in the register
  • Service · not recorded for this field in the register
  • Certification or compliance claims · not recorded for this field in the register
  • Rack density · not recorded for this field in the register
  • Space or power availability · not recorded for this field in the register
  • Specifications and facility pages · not recorded for this field in the register
  • Business contact · not recorded for this field in the register
  • Public registration · not recorded for this field in the register
  • Fact supported by a source quotation · not recorded for this field in the register

Jurisdiction and policy actions

Policy actions are matched to this facility by jurisdiction (state, county, municipality or utility), never by the facility's name. A match means the action covers the place, not that it names or affects this facility.

Updates, corrections and review

Last checked

How often we re-check

We plan to re-check this facility every 90 days because it has a reviewed record whose status may still change. Next check due . The last-checked date is the newest evidence date among this facility's sources. Dates are measured against the newest input date, , not the day this page was built.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

How complete the facility register is

Rights for this record

For each populated field, the origin of the value shown on this page and the terms it carries. Values that are not redistributable may be read and cited here but are not relicensed.

FieldSupplied byOriginLicenseAttributionRedistributable
current_nameDataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano
aliases[0]DataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano
aliases[1]DataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano
aliases[2]DataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano
aliases[3]DataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano
location.cityDataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano
location.city_keyDataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano
location.stateDataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano
presences[0]DataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano
status_by_layer[0]DataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano
lifecycle_statusDataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano
status_basisDataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano
layer_values[0]DataCenterData reviewed record eternal-mind-loring-data-center-medcd reference onlyreference onlyDataCenterDatano