building · ME · last checked 14 September 2026

Eternal Mind Loring Data Center Building

Lifecycle label: proposed; effective date not established Status evidence: Loring Development Authority FY2023 tenant report and June 21, 2023 board minutes reporting a nine-year data-center-building lease Evidence: Independently source-linked Reuse: Reference only

Facts at a glance

Record ID
eternal-mind-loring-data-center-me
Record type
building
Developer
Not named in the cited records
Operator
Not named in the cited records
Owner
Owner of record not established
Tenant
Eternal Mind, Inc.
Capacity
Unknown No independently supported figure
No selected qualifying record states critical-IT, gross-facility, utility-request, utility-service, generation, company-design or measured-load MW. The 8,000-square-foot building figure is physical scale, not capacity.
Location
Limestone, ME
approximate — Bounded only to Loring Commerce Centre in Limestone, Maine. The 154 Development Drive address in the June 2023 document is the board-meeting location, not the data-center building. No building number, street address, parcel, coordinate, or county field is asserted.
Physical scale
Physical scale: LDA board minutes describe one 8,000-square-foot Data Center building. This is a reported building area, not white space, commissioned compute area, occupied area, campus area, parcel area, building count beyond this one record, or MW capacity.

What the sources support

The Loring Development Authority of Maine's FY2023 annual report lists Eternal Mind, Inc. in its Loring Commerce Centre tenant attachment and describes it as an AI quantum-computing company. LDA's June 21, 2023 board minutes report, as a Green 4 Maine accomplishment, a nine-year lease with Eternal Mind for the 8,000-square-foot Data Center building. This supports one lease/tenant-backed proposed building on dated public-authority records. It does not establish that the lease remains in force today, the lease start or end dates, regulatory approval, construction, commissioning, current occupancy, energization, or operation. The later FY2024 tenant attachment omits Eternal Mind but expressly warns that it may not list all subtenants of third-party owners such as Green 4 Maine; the omission therefore neither proves continued tenancy nor termination.

Definitions: record units · roles · capacity boundaries · lifecycle stages.

What remains unknown

Sources

Record history

Record history · 21 June 2023 · DataCenterData review

eternal-mind-loring-data-center-me → Record

Why LDA board minutes reported a nine-year lease with Eternal Mind for an 8,000-square-foot Data Center building; lease commencement and expiration dates were not supplied.

Evidence No additional evidence link; see the linked record or claim.

DataCenterData record added · 14 September 2026 · DataCenterData review

eternal-mind-loring-data-center-me → Publication

Why Qualified as one proposed building from dated lease and tenant records; current tenancy, occupancy and operation remain unknown.

Evidence No additional evidence link; see the linked record or claim.

Data + actions

Permanent link for citing this record →

Suggest a correction → Record ID eternal-mind-loring-data-center-me and the page are prefilled. Accepted material corrections appear on Changes.