Licensed lead · not independently verified · dcd-dir-001974

Project Horizon (Tech oNE Crossing)

source-reported permitted

Starwood Digital Ventures

Kearney · Buffalo County · Nebraska

Capacity not established; source review excludes the published figureSource updated 12 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Project Horizon (Tech oNE Crossing).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Starwood Digital Ventures
Address and locality
Kearney · Buffalo County · Nebraska
Official metro area
Outside an official metropolitan boundary
Source-reported status
permitted
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
12 October 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001974
Capacity held out of the public projection.

368 MW is explicitly total electrical demand at full build-out, not established IT capacity. The upstream row remains attributed below, but this value is not repeated as site capacity.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Nebraska Public Power DistrictUtility as named by the provider.
Power source
GridProvider label.
Cooling
Closed-loopProvider label.
Announced
August 2026Provider-reported announcement date.

Provider notes

Energy. Phase 1 reuses 100 MW of existing capacity at the site's crypto-mining operation; SDV said it would pay for any infrastructure upgrades needed for the added demand.

Water. Closed-loop chilled water system with a one-time fill; projected ~3.6 million gallons/year in total (KSNB), most of it landscaping (~2.24 million gal/yr at full buildout); Central Nebraska Today puts the data center alone at ~1,200 gallons/day.

What the source record says

Multi-phase data center campus at Tech oNE Crossing, east of Antelope Ave. and south of Tech One Blvd/Global Drive, outside Kearney city limits. 368 MW total electrical demand at full build-out. Phase 1 reuses the 100 MW of capacity at the adjacent existing crypto-mining site, which is to be decommissioned after Phase 1; Phase 3 extends onto the former mining property. That mining site is tracked separately as mara-kearney-buffalo-ne; this record is the successor AI/data-center campus, not a duplicate of it. WOWT reports ~112 acres, first phase completion by late 2027 and full capacity around 2030; the tenant is undisclosed under NDA. Permit conditions: development must begin within two years, plus annual hazardous-materials inventory. COORDINATES ARE APPROXIMATE, borrowed from the adjacent mining site on the same Tech oNE Crossing parcel complex.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2026-08-21 · source-reported proposed

    Kearney Planning Commission unanimously recommended a conditional use permit for Project Horizon at Tech oNE Crossing; applicant Worldwide Mission Critical, with Starwood Digital Ventures (SDV) partnering with MARA.

    Open cited source →

  2. 2026-09-08 · source-reported permitted

    Kearney City Council unanimously approved the Project Horizon conditional use permit.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID starwood-project-horizon-kearney-ne. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001974

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Kearney, NE · Buffalo (Approximate location)

Roles

  • Operator: Starwood Digital Ventures

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported permitted

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: August 2026

    Provider-reported announcement date.

  • Status history: 2026-08-21 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-09-08 · source-reported permitted

    Status history supplied by the source.

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Nebraska Public Power District

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-12

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →