Licensed lead · not independently verified · dcd-dir-001611

DC BLOX Palm Coast Cable Landing Station

source-reported under construction

DC BLOX

1109 Town Center Blvd · Palm Coast · Flagler County · Florida · 32164

Reported planned 10 MWSource updated 21 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for DC BLOX Palm Coast Cable Landing Station.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
DC BLOX
Address and locality
1109 Town Center Blvd · Palm Coast · Flagler County · Florida · 32164
Official metro area
Deltona-Daytona Beach-Ormond Beach, FL
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 10 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
21 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001611

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Cooling
Closed-loopProvider label.
Announced jobs
15 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
Announced
9 July 2025Provider-reported announcement date.

Provider notes

Water. City states a closed-loop cooling system that recirculates water rather than continuously consuming new supply; company describes water use as similar to a small commercial building.

Community. Residents raised concerns about electricity costs, grid capacity and transparency (project was confidential under state law); the city issued clarifications distinguishing the approved 33,760 sq ft building from larger conceptual plans.

What the source record says

Subsea cable landing station with colocation in Palm Coast Town Center: one approved building of 33,760 sq ft (FlaglerLive records: 34,875 sq ft incl. guard house), <10 MW at full operation per the city, Tier III design, capacity for up to six subsea cables including Google's Sol (Palm Coast–Bermuda–Azores–Spain). Initial phase expected operational Q1 2027. Original land purchase was 34 acres. DC BLOX cites >$100M potential direct investment over time (not a committed site figure, so not recorded).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-07-09 · source-reported proposed

    Announced with the City of Palm Coast; Google's Sol transatlantic cable to land at the campus.

    Open cited source →

  2. 2026-04-08 · source-reported under construction

    City of Palm Coast building permit 2025100821 issued 2026-04-08; city reports the project under construction (FlaglerLive reports construction began March 2026).

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1+reviewed-2610e0556b3d, under CC BY 4.0. Upstream ID dc-blox-palm-coast-cable-landing-station-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labelled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001611

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • 1109 Town Center Blvd, Palm Coast, FL 32164 · Flagler (Approximate location)

Roles

  • Operator: DC BLOX

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 9 July 2025

    Provider-reported announcement date.

  • Status history: 2025-07-09 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-04-08 · source-reported under construction

    Status history supplied by the source.

Power capacity

  • Reported capacity: Planned: 10 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced jobs: 15 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-21

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →