Licensed lead · not independently verified · dcd-dir-001566

Western Hospitality Childersburg Campus

source-reported proposed

Western Hospitality Partners

Childersburg · Talladega County · Alabama

Capacity not statedSource updated 9 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Western Hospitality Childersburg Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Western Hospitality Partners
Address and locality
Childersburg · Talladega County · Alabama
Official metro area
Outside an official metropolitan boundary
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not stated
Source freshness
9 September 2026
Location precision
approximate
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001566

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Cooling
Closed-loopProvider label.
Land area
486 acres (source-reported; parcel boundary not established)
Announced investment
$6 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
200 permanent · 2,000 constructionAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.

Provider notes

Water. Source describes "advanced glycol-based closed-loop cooling" intended "to minimize local water impact" — an explicitly recirculating circuit, so closed_loop under the cooling decision rule even though heat is ultimately rejected without evaporative water use. No withdrawal or consumption figure is stated.

What the source record says

⚠️ WEAKEST-SOURCED RECORD IN THIS SET — flagged deliberately. The only source successfully fetched in this run is Baxtel, a data-center marketplace aggregator, which states: Childersburg Industrial Park (formerly the Alabama Ordnance Works), 486 acres, "a $6 billion proposed investment", "advanced glycol-based closed-loop cooling", "over 200 permanent positions and approximately 2,000 construction jobs", status "Future facility in planning with land secured", year planned 2029, currently in due-diligence assessment of environmental readiness for the former military site. confidence is therefore "reported", not "confirmed". FIGURES DELIBERATELY OMITTED because no fetched source states them: a 500 MW capacity (asserted by cleanview.co and servercountry.org, neither cited here) and a ~$17 million city land-purchase agreement for the 486 acres (search-summary only). Primary coverage by Inside Climate News (23 Jan 2026, "This Small Alabama Town Was Part of the Manhattan Project...") returned HTTP 403 to both source retrieval and direct retrieval, and the WBHM syndication returned 404, so neither is cited. NEXT STEP for a maintainer: Childersburg City Council minutes should carry the purchase-service agreement for the 486 acres and would upgrade this record to confirmed with a primary document. Coordinates are the Childersburg municipal centroid, NOT the industrial-park parcel — "Childersburg Industrial Park" and "Alabama Ordnance Works" both return empty from Nominatim. Site history: the Alabama Ordnance Works / Alabama Army Ammunition Plant, a WWII-era Manhattan Project-adjacent munitions site, which is why environmental due diligence is the gating step.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID western-hospitality-childersburg-al. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001566

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Childersburg, AL · Talladega (Approximate location)

Roles

  • Operator: Western Hospitality Partners

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

Area, acreage and buildings

  • Land area: 486 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $6 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 200 permanent · 2,000 construction

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-09

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →