Thor Equities Augusta Township Data Center (Form8tion)

source-reported cancelled

Thor Equities

Augusta Township · Washtenaw County · Michigan

Capacity not statedSource updated 9 September 2026approximate location · provider confidence label: reported
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Thor Equities Augusta Township Data Center (Form8tion).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Thor Equities
Address and locality
Augusta Township · Washtenaw County · Michigan
Official metro area
Ann Arbor, MI
Source-reported status
cancelled
Provider facility type
data center
Reported capacity
Not stated
Source freshness
9 September 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
reported (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001449

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
DTE EnergyUtility as named by the provider.
Power source
GridProvider label.
Land area
810 acres (source-reported; parcel boundary not established)
Announced investment
$1 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
2024Provider-reported announcement date.

Provider notes

Community. Opposition ran the full course: the Planning Commission recommended denial 5-1 (2025-06), the Board of Trustees approved the rezoning anyway (2025-07), residents gathered 957 signatures to force a referendum (2025-08), and the rezoning was overturned at the ballot on 2026-08-04 by roughly 90% of voters. A recall effort against the township board followed.

What the source record says

Site north of Milan-Oakville Road, east of Hitchingham Road, Augusta Township, Washtenaw County MI (between Ann Arbor and Monroe). No end user announced; planners cited Google and Microsoft as typical users of this facility type. Form8tion is Thor's digital infrastructure arm (founded March 2023). Capacity not disclosed; at least five large buildings planned. Voter referendum outcome will determine project viability. Coordinates are approximate Augusta Township centroid. SOURCE CONFLICT RESOLVED 2026-08-08: the earlier "rejected by voters" claim in an article predating the election was a pre-election piece describing the UPCOMING vote — the dates now reconcile because the referendum has since been held. Augusta Township voters overturned the 522-acre rezoning on 2026-08-04 (about 90% to overturn), so the parcels revert to agricultural residential. Recorded as "cancelled" because the project's enabling rezoning is gone; note that Thor Equities has NOT publicly withdrawn, and the results were unofficial as of 2026-08-05 — revisit if the developer re-applies or the count is certified differently. Status re-check, NO change: the record's 'cancelled' status dated 2026-08-04 corresponds to the Aug. 4 veto referendum on the 522-acre rezoning, and nothing found indicates a revival, appeal or re-rezoning since. CAVEAT: I could not fetch a page carrying the certified vote totals - the Ballotpedia result page returned empty content - so this confirms the mechanism and date, not the tally. Worth one more check before the record is treated as settled.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2024 · source-reported proposed

    Thor Equities (via Form8tion / JDS Equities II LLC) acquires 810 acres in Augusta Township; seeks rezoning of 522 acres from agricultural/residential to General Industrial

    Open cited source →

  2. 2025-06 · source-reported proposed

    Augusta Township Planning Commission recommends denial 5-1, citing inconsistency with land-use plans

    Open cited source →

  3. 2025-07 · source-reported proposed

    Augusta Township Board of Trustees unanimously approves rezoning of 522 acres despite Planning Commission denial

    Open cited source →

  4. 2025-08 · source-reported proposed

    Residents collect 957 signatures for ballot initiative (threshold was 561); question set for 2026 ballot (May or August primary election) to overturn rezoning

    Open cited source →

  5. 2026-08-04 · source-reported cancelled

    Augusta Township voters overturned the rezoning at the August primary — about 90% voted to overturn — returning the seven parcels to agricultural residential and removing the zoning the project depended on. Results were still unofficial as of 2026-08-05.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID thor-equities-augusta-township-mi. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001449

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Augusta Township, MI · Washtenaw (Approximate location)

Roles

  • Operator: Thor Equities

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported cancelled

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2024

    Provider-reported announcement date.

  • Status history: 2024 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-06 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-07 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-08 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-08-04 · source-reported cancelled

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 810 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: DTE Energy

    Utility as named by the provider.

  • Power source: Grid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $1 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-09

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →