Reported geography
Source-reported location for TECfusions Keystone Connect.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- TECfusions
- Address and locality
- Upper Burrell Township · Westmoreland County · Pennsylvania
- Official metro area
- Pittsburgh, PA
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 3,000 MW (stated as “over a six-year buildout”; scope: campus; provider note: “3 GW planned over a six-year buildout”; cited source: TECfusions Unveils Massive 1400-Acre Data Center Project in Pennsylvania, Revitalizing Former Industrial Plant) (source-reported; boundary not independently verified; MW measure not stated by provider). Operational: not established; source review excludes the published operational figure
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001431
The provider note describes 12 MW only as “immediately available in existing buildings” on a proposed campus; availability on a proposed site is not a demonstrated operating load, so it is not repeated as operational capacity. The 3,000 MW is retained only as the developer’s phased plan, “3 GW planned over a six-year buildout”, from a company press release. The separate review note on this row, recording a local news report that one building is already live for a tenant, gives no operational load figure.
The planned figure is retained only as the provider states it: 3,000 MW, over a six-year buildout (stated as “over a six-year buildout”; scope: campus; provider note: “3 GW planned over a six-year buildout”; cited source: TECfusions Unveils Massive 1400-Acre Data Center Project in Pennsylvania, Revitalizing Former Industrial Plant). Open the cited source → The upstream row remains attributed below; no operational figure is repeated as site capacity, and unknown is not zero.
The underlying provider record is retained. These notes add source-attributed context and flag conflicts; any withheld value is explained separately. They do not certify current operation.
- status: Provider status: proposed. A local news report dated 2026-09-03 says one building is already live for a tenant, citing TribLive and a company release.
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- On-site gas
- Land area
- 1,395 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: litigation
- AI-use label (provider)
- confirmed
- Announced
- 14 January 2025
Incentives reported by the source
Whether each incentive was approved, awarded or received is not established.
- Pennsylvania Redevelopment Assistance Capital Program (RACP) · Pennsylvania · 2025 · $2 million (as stated) Open cited source →
Provider notes
Energy. On-site natural gas generation with dual utility feeds and microgrid capability; the developer says discussions are under way to export excess power to the local grid.
Community. Upper Burrell Township passed a 180-day data-center moratorium in May 2026, but it did not apply to permits already granted to TECfusions for 'Building J', and supervisors approved a land development plan for that building on Aug. 5, 2026 despite the moratorium. Protect PT (an environmental advocacy group) and New Kensington residents Fuller and Allen Uhler filed a land-use appeal against township approvals with the Westmoreland County Court of Common Pleas. More than 50 residents attended an August supervisors meeting, most opposed.
What the source record says
Adaptive reuse of the former Alcoa research and development campus in Upper Burrell, Westmoreland County: 1,395 acres, 3 GW planned over a six-year buildout, with 12 MW described as immediately available in existing buildings. Awarded a $2 million Pennsylvania RACP grant. Investment total not disclosed by the developer.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-01-14 · source-reported proposed
TECfusions announced acquisition of the 1,395-acre former Alcoa R&D campus and a phased 3 GW AI/HPC campus.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- TECfusions Unveils Massive 1400-Acre Data Center Project in Pennsylvania, Revitalizing Former Industrial Plant · TECfusions via PR Newswire
- Data Centers in Pennsylvania — Project List & Locations (TECfusions Keystone Connect, Westmoreland, 3,000 MW planned) · Cleanview
- Upper Burrell residents decry transparency as data center progresses despite moratorium and a lawsuit · PublicSource
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID tecfusions-keystone-connect-upper-burrell-pa. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001431
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): confirmed
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Upper Burrell Township, PA · Westmoreland (Approximate location)
Roles
- Operator: TECfusions
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 14 January 2025
Provider-reported announcement date.
- Status history: 2025-01-14 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 1,395 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 3,000 MW (stated as “over a six-year buildout”; scope: campus; provider note: “3 GW planned over a six-year buildout”; cited source: TECfusions Unveils Massive 1400-Acre Data Center Project in Pennsylvania, Revitalizing Former Industrial Plant) (source-reported; boundary not independently verified; MW measure not stated by provider). Operational: not established; source review excludes the published operational figure
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: On-site gas
Provider label.
Permits, incentives, jobs and proceedings
- Community response: Provider label: litigation
Compute Atlas characterization, not a DataCenterData assessment.
- Incentive reported by the source: Pennsylvania Redevelopment Assistance Capital Program (RACP) · Pennsylvania · 2025 · $2 million (as stated)
Whether the incentive was approved, awarded or received is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-10
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.