Serverfarm ARK Clarksville Data Center Campus

source-reported under construction

Serverfarm

Clarksville · Johnson County · Arkansas

Reported planned 432 MWSource updated 15 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Serverfarm ARK Clarksville Data Center Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Serverfarm
Address and locality
Clarksville · Johnson County · Arkansas
Official metro area
Outside an official metropolitan boundary
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 432 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
15 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001310

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Clarksville Connected UtilitiesUtility as named by the provider.
Power source
On-site gasProvider label.
Cooling
Closed-loopProvider label.
Land area
463 acres (source-reported; parcel boundary not established)
Announced investment
$6.6 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
Announced
November 2025Provider-reported announcement date.

Provider notes

Energy. Per an ADEQ air permit application reported by the Arkansas Democrat-Gazette, the campus is to be served by 40 on-site natural gas turbines rated 16.5 MW each (about 660 MW combined base load) built on property adjacent to the data center, plus 10 natural gas line heaters and three diesel emergency generators. Clarksville Connected Utilities holds an energy service agreement with Serverfarm for 18 MW for 'construction power only.' The on-site generation plant is tracked separately as serverfarm-clarksville-power-plant-ar.

Water. Serverfarm's own campus page describes 'ACC Waterless' cooling in which 'cooling fluid circulates through a sealed loop' that 'recirculates water, significantly reducing water consumption' (stated as roughly 70% less than traditional cooling). The Arkansas Democrat-Gazette (Nov. 2025) described it as 'a closed-circuit water cooling system, a system that is less water intensive than other water cooling systems.' Recorded as closed_loop because a recirculating water circuit is present; the 'waterless' marketing phrase alone does not make it air-cooled.

Community. Arkansas Advocate reporting (July 2026) found divided local opinion: some residents optimistic about tax revenue and university partnerships, others skeptical ('A lot of it sounds like we got a lot of promises, but I don't think I'm the only one that believes big corporations don't always keep their promises'). More than 80 questions were submitted in advance of a town hall over environmental impact, utility costs and transparency.

What the source record says

Coordinates are an OpenStreetMap geocode of Palmer Road in Clarksville, the road the Arkansas Democrat-Gazette identifies as the site's location ('just north of the city's water treatment plant on Palmer Road'); this is a road-level approximation, not a parcel-confirmed footprint. Reported figures diverge across sources and are NOT reconciled here: acreage is reported as two parcels totaling 135 acres at acquisition (Nov. 2025) and as a 463-acre campus (Aug. 2026); investment is reported as 'at least one billion' (Nov. 2025), $6.6 billion (2026 reporting and Serverfarm's own page) and $8 billion (Arkansas Advocate, May 2026); building count is reported as four (Serverfarm's own page and the 2026 permit reporting), five (Nov. 2025) and six (trade press). Building size is given as 300,000 sq ft each by Serverfarm and 360,000 sq ft each in trade press. The 463-acre and $6.6 billion figures are used above as the most recent reported values. Serverfarm is owned by Manulife Investment Management per trade press not fetched in this pass and so not cited.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-11 · source-reported proposed

    Serverfarm affiliate SF ARK1 LLC acquired two parcels totaling 135 acres just north of Clarksville's water treatment plant on Palmer Road; land was rezoned from rural to industrial. Five buildings in three phases were then planned, with the tenant company undisclosed.

    Open cited source →

  2. 2026-08 · source-reported under construction

    Arkansas Democrat-Gazette reported construction underway on a 463-acre campus near Johnson Regional Medical Center, with an initial phase of four buildings each drawing about 108 MW; Serverfarm's own site says it plans to complete the first two buildings by January 2028.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID serverfarm-clarksville-ar. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001310

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Clarksville, AR · Johnson (Approximate location)

Roles

  • Operator: Serverfarm

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: November 2025

    Provider-reported announcement date.

  • Status history: 2025-11 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2026-08 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 463 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 432 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Clarksville Connected Utilities

    Utility as named by the provider.

  • Power source: On-site gas

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $6.6 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-15

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →