Licensed lead · not independently verified · dcd-dir-001308

Sequitor Edge Rapid City

source-reported proposed

Sequitor Edge

S Highway 79, Black Hills Industrial Center · Rapid City · Pennington County · South Dakota

Capacity not established; source review excludes the published figureSource updated 10 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Sequitor Edge Rapid City.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Sequitor Edge
Address and locality
S Highway 79, Black Hills Industrial Center · Rapid City · Pennington County · South Dakota
Official metro area
Rapid City, SD
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not established; source review excludes the published figure
Source freshness
10 October 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001308
Capacity held out of the public projection.

Row note expressly leaves capacity unset because sources conflict (2, 10, and 15 MW claims). The upstream row remains attributed below, but this value is not repeated as site capacity.

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Black Hills EnergyUtility as named by the provider.
Cooling
Closed-loopProvider label.
Land area
10 acres (source-reported; parcel boundary not established)
Announced jobs
3 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →

Provider notes

Energy. Reported to require no new grid infrastructure for the initial phase.

Water. Closed-loop cooling system with a one-time water fill of approximately 19,000 gallons (Baxtel, fetched 2026-09-13).

What the source record says

Capacity is disputed between the two sources fetched this run and is deliberately omitted from capacityMw rather than guessed: Baxtel states an initial 2MW phase scaling to 10MW; KOTA TV separately reports 15MW for the same project (also citing a 1.3 PUE design target vs. an industry average of 1.8-2.0). Tier 3 edge computing facility, greenfield, an initial ~30,000 sq ft building on a 1-acre footprint within a 10-acre site, expandable to five data halls across 7 acres. Construction was reported (both sources) to begin late summer 2026 with a roughly 14-month build targeting a 2027 opening; no source checked this run (2026-09-13) confirms construction has actually started. Coordinate is an OSM Nominatim road-level geocode of S Highway 79, Rapid City -- not a confirmed parcel.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID sequitor-edge-rapid-city-sd. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001308

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • S Highway 79, Black Hills Industrial Center, Rapid City, SD · Pennington (Approximate location)

Roles

  • Operator: Sequitor Edge

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

Area, acreage and buildings

  • Land area: 10 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not established; source review excludes the published figure

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Black Hills Energy

    Utility as named by the provider.

Cooling, water, PUE and WUE

  • Cooling: Closed-loop

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced jobs: 3 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-10

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →