Reported geography
Source-reported location for Potentia Oklahoma Campus 02 (Inola).
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Potentia, Inc.
- Address and locality
- Inola · Rogers County · Oklahoma
- Official metro area
- Tulsa, OK
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 2,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 10 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-001129
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 1,850 acres (source-reported; parcel boundary not established)
- Community response
- Provider label: mixed
- AI-use label (provider)
- likely
- Announced
- May 2026
Provider notes
Community. Only source found is a nearby resident's personal Substack post (2026-05-31), not local news or a government record. The resident documents his own opposition (concern about HVAC noise and industrial character) and notes the area is already fighting a separate proposed aluminum smelter, but as of the post date the Inola project was not yet publicly announced/agendized and no organized campaign or hearing had occurred. Treat as one documented voice of concern, not a canvassed community reaction.
What the source record says
Roughly 1,850 acres in Rogers County bounded by 4190 Road and 4200 Road, adjacent to the Port of Inola and existing high-voltage transmission serving the Sofidel plant. Reporting describes recorded deeds, site clearing and HV substation work, and a Building 1 target of Q2 2027; the 2.0 GW figure comes from a third-party tracker, not the developer. Coordinates are approximate to the town of Inola, not a parcel-confirmed point.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2026-05 · source-reported proposed
Land assembled via 'Tulsa Farms' entities; Tulsa Port Authority–Rogers County board agenda lists a purchase-agreement amendment with Potentia Tulsa 1 LLC.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- The Data Center Coming to Inola, Oklahoma: What We Know · Joe Crivelli
- Potentia Inc. Data Centers and Colocation — Campus 02 (Oklahoma) · Baxtel
- Oklahoma Data Center Projects tracker — Potentia Oklahoma Campus 02, Inola · Server Country
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID potentia-oklahoma-campus-02-inola-ok. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-001129
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
- AI-use label (provider): likely
Compute Atlas classification, not a DataCenterData finding.
Location and precision
- Inola, OK · Rogers (Approximate location)
Roles
- Operator: Potentia, Inc.
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: May 2026
Provider-reported announcement date.
- Status history: 2026-05 · source-reported proposed
Status history supplied by the source.
Area, acreage and buildings
- Land area: 1,850 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 2,000 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Community response: Provider label: mixed
Compute Atlas characterization, not a DataCenterData assessment.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-10
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.