Licensed lead · not independently verified · dcd-dir-000703

Goodman Innovation Centre San Jose (NorthTown Data Center)

source-reported proposed

Goodman Group

350 West Trimble Road · San Jose · Santa Clara County · California · 95134

Planned 97.3 MWSource updated 14 September 2026approximate location · confirmed source confidence
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Goodman Innovation Centre San Jose (NorthTown Data Center).

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Facility snapshot

Operator as published
Goodman Group
Address and locality
350 West Trimble Road · San Jose · Santa Clara County · California · 95134
Source-reported status
proposed
Facility type
data center
Reported capacity
Planned: 97.3 MW (source-reported; boundary not independently verified)
Source freshness
14 September 2026
Location precision
approximate
Source confidence
confirmed
Stable directory ID
dcd-dir-000703

What the source record says

Site is 350 & 370 West Trimble Road at Orchard Parkway. The CEC applicant of record for the backup generating facility is GIC San Jose, LLC; Goodman announced the acquisition and redevelopment and renamed the estate. The 45.8 acres is the whole estate; the CEC gives the data center project site as about 28.5 acres.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-10-30 · source-reported proposed

    Goodman announced acquisition of the 45.8-acre estate for redevelopment into a two-building, ~414,000 sq ft data center campus with up to 97.3 MW available by 2028.

    Open cited source →

Sources and attribution

Adapted from Compute Atlas by Edward Kubiak, edition 1.33.0, under CC BY 4.0. Upstream ID goodman-innovation-centre-san-jose-ca. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added.

No reviewed match is linked.

This does not mean the row is wrong. It means DataCenterData has not promoted it through the independent evidence workflow.

Corrections

Report an error in this row →