Licensed lead · not independently verified · dcd-dir-000628

Fisk University Quantum Leap Innovation & Technology Center

source-reported proposed

Fisk University

Herman Street at 17th Avenue North · Nashville · Davidson County · Tennessee

Reported planned 30 MWSource updated 21 September 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Fisk University Quantum Leap Innovation & Technology Center.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
Fisk University
Address and locality
Herman Street at 17th Avenue North · Nashville · Davidson County · Tennessee
Official metro area
Nashville-Davidson--Murfreesboro--Franklin, TN
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Planned: 30 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
21 September 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000628

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Nashville Electric ServiceUtility as named by the provider.
Land area
5 acres (source-reported; parcel boundary not established)
Announced investment
$400 millionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Community response
Provider label: contestedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
likelyCompute Atlas classification, not a DataCenterData finding.
Announced
May 2026Provider-reported announcement date.

Provider notes

Energy. Don Hardin, whose construction management firm is a partner on the project, said Nashville Electric Service assured developers it can handle the facility's 30-megawatt need (WSMV, 2026-06-08). No on-site generation is described in either source.

Community. Two petitions circulated against the plan within weeks of the May 2026 announcement, one on Change.org with more than 4,200 signatures and another with more than 360, and residents and Fisk alumni spoke against it. Objections cited in the coverage are the project's break with the university's civil-rights history and unknown environmental, water, energy and noise effects, not a specific documented harm.

What the source record says

Announced May 2026 as the anchor of Fisk's ~$1 billion "Quantum Leap" campus master plan. The 100,000 sq ft Innovation & Technology Center splits into 30,000 sq ft of academic space and a 70,000 sq ft, 30MW technology shell that DCD reports will be set aside for a data-center partner not yet named; the $400m figure is that portion of the project, not the whole master plan. Fisk itself avoids the phrase "data center" and calls it an Innovation & Technology Center. Site is five undeveloped acres, a former athletics track just west of Johnson Gymnasium at 17th Avenue North and Herman Street in the 37208 ZIP. Still awaiting Nashville Metropolitan Planning Commission approval as of the sources' dates, so status is proposed. Coordinates are a geocode of Herman Street within 37208, not a parcel; no source states lat/lon. No subsidy agreement is mentioned in either source.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

No status history was supplied in this edition.

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID fisk-quantum-leap-nashville-tn. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000628

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): likely

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Herman Street at 17th Avenue North, Nashville, TN · Davidson (Approximate location)

Roles

  • Operator: Fisk University

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: May 2026

    Provider-reported announcement date.

Area, acreage and buildings

  • Land area: 5 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 30 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Nashville Electric Service

    Utility as named by the provider.

Permits, incentives, jobs and proceedings

  • Announced investment: $400 million

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: contested

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-09-21

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →