Licensed lead · not independently verified · dcd-dir-000115

AVAIO Digital Taurus

source-reported under construction

AVAIO Digital Partners

Brandon · Rankin County · Mississippi

Reported planned 116 MWSource updated 7 October 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for AVAIO Digital Taurus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
AVAIO Digital Partners
Address and locality
Brandon · Rankin County · Mississippi
Official metro area
Jackson, MS
Source-reported status
under construction
Provider facility type
data center
Reported capacity
Planned: 116 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Source freshness
7 October 2026
Location precision
approximate (provider label: exact; the provider's own note describes an approximate location)
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-000115

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Electric utility
Entergy MississippiUtility as named by the provider.
Power source
MixedProvider label.
Cooling
HybridProvider label.
Land area
329 acres (source-reported; parcel boundary not established)
Announced investment
$6 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
60 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: mixedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
AI-use label (provider)
confirmedCompute Atlas classification, not a DataCenterData finding.
Announced
2025Provider-reported announcement date.

Incentives reported by the source

Whether each incentive was approved, awarded or received is not established.

  • Mississippi Data Center Enterprises tax exemption (approved by MDA; sales & use tax incentives for campus tenants; multi-year, no confirmed total amount) · Mississippi · 2025 Open cited source →
  • Data Center Enterprises tax exemption · Mississippi · 2025 Open cited source →

Provider notes

Energy. Initial 116 MW grid power via executed ESA with Entergy Mississippi (June 2027 target energization). Additional 420 MW grid power from Entergy projected by end of 2030. On-site thermal generation via Gulf South Pipeline access (up to 500 MW planned, Q2 2027 start) — on-site gas not yet built. Rooftop solar 20+ MW planned. Behind-the-meter generation noted by operator.

Water. Operator describes water-efficient cooling, rainwater recapture, cooling system economization (air-side economization implied), and recycled water as an available option. New sewer line extension under construction for wastewater. No specific MGD figure disclosed.

Community. Strong official support: Governor Reeves, Mayor Butch Lee (Brandon), Rankin County, and MDA all endorsed project. Community opposition emerged before groundbreaking: online petition to Rankin County Board of Supervisors demanded written guarantees against utility bill increases and air/water pollution, and called for construction halt if guarantees cannot be made. Residents cited concerns about water consumption, air pollution (referencing xAI Memphis gas turbine precedent), power demands, and traffic. Community group 'Mississippi For Mississippi' produced an impact-distance map. …

What the source record says

Distinct from AVAIO's 'Leo' campus in Little Rock/Pulaski County AR — do not conflate. Site: East Metropolitan Center Business and Industrial Park, Brandon. Land acreage: AVAIO's own project page and groundbreaking materials cite 329 acres; the August 19 press release cited 175 acres — 329 used as more authoritative per operator's site. Capacity: 116 MW initial via executed ESA with Entergy Mississippi (energized June 2027 per operator site); Entergy guiding an additional 420 MW of grid power available by end of 2030; access to Gulf South Pipeline for up to 500 MW of on-site behind-the-meter thermal generation starting Q2 2027 — total baseload path to over 1 GW. The 116 MW planned figure reflects the executed first-phase ESA only; full buildout remains a projection. Investment: $6B stated without 'up to' qualifier across operator, MDA, and Governor's office sources; Governor's office describes it as the third-largest economic development project in Mississippi history. Jobs: 'at least 60 direct, high-tech jobs' and 'hundreds of indirect jobs ranging from construction to other related industries' — projections, not firm figures; no construction vs permanent breakdown confirmed. Rooftop solar of 20+ MW planned (behind-the-meter). Recycled water and new sewer line extension cited by operator as water infrastructure options. Estimated $23M in ad valorem tax revenue annually per Rankin First (county economic development group). Coordinates approximate (Brandon city center, Rankin County).

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-08-19 · source-reported proposed

    AVAIO Digital announced $6B AI-ready data center campus in Brandon, Rankin County, MS; Mississippi Development Authority approved Data Center Enterprises tax exemption.

    Open cited source →

  2. 2025-09-10 · source-reported under construction

    Groundbreaking held at East Metropolitan Center Business and Industrial Park in Brandon.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID avaio-taurus-brandon-ms. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

Operator’s own listing

What the operator publishes about this site on its own website, matched to this licensed row by DataCenterData. Facts are taken from the operator’s page, shown with a link to it, and not independently verified; no page text is republished and the licensed values above are unchanged. A match does not establish that the listing and this row cover exactly the same building, suite or boundary, or who owns the site.

Listed by AVAIO Digital Partners on its website (captured 2 October 2026)
Name as listed
Taurus
Address as published
Brandon, MS

Lifecycle status is not published for this listing.

Utility power: 536 MW. Scope campus · stated as planned. Utility power as stated for this campus. Not critical IT capacity or measured load. The source describes this as planned, not a measured live figure. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 2 October 2026.

Site area: 329 acres. Scope campus · current or planned not stated. Site area as stated for this campus. Land area as stated; not building floor area. The source does not say whether the figure is live or planned. No effective date is stated; the capture date is not the measurement date. Open the operator’s page → Captured 2 October 2026.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Open the operator’s page → captured 2 October 2026

Matched to this licensed row on operator and city only: this is the one site the operator lists in this city and the only licensed row of that operator there, with reviewed subject identity; no address or boundary is established for this row.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-000115

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

  • AI-use label (provider): confirmed

    Compute Atlas classification, not a DataCenterData finding.

Location and precision

  • Brandon, MS · Rankin (Approximate location)

Roles

  • Operator: AVAIO Digital Partners

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported under construction

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 2025

    Provider-reported announcement date.

  • Status history: 2025-08-19 · source-reported proposed

    Status history supplied by the source.

  • Status history: 2025-09-10 · source-reported under construction

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 329 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Planned: 116 MW (source-reported; boundary not independently verified; MW measure not stated by provider)

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Electric utility: Entergy Mississippi

    Utility as named by the provider.

  • Power source: Mixed

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Hybrid

    Provider label.

Permits, incentives, jobs and proceedings

  • Announced investment: $6 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 60 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: mixed

    Compute Atlas characterization, not a DataCenterData assessment.

  • Incentive reported by the source: Mississippi Data Center Enterprises tax exemption (approved by MDA; sales & use tax incentives for campus tenants; multi-year, no confirmed total amount) · Mississippi · 2025

    Whether the incentive was approved, awarded or received is not established.

  • Incentive reported by the source: Data Center Enterprises tax exemption · Mississippi · 2025

    Whether the incentive was approved, awarded or received is not established.

Sources, dates, limitations and corrections

  • Provider update date: 2026-10-07

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →