This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for AVAIO Appomattox Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- AVAIO Digital Partners
- Address and locality
- 1098 Oakville Rd · Appomattox · Appomattox County · Virginia
- Official metro area
- Lynchburg, VA
- Source-reported status
- permitted
- Provider facility type
- data center
- Reported capacity
- Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 27 August 2026
- Location precision
- approximate
- Compute Atlas confidence label
- reported (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000112
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Land area
- 452 acres (source-reported; parcel boundary not established)
- Announced investment
- $3 billion
- Announced
- 10 December 2024
What the source record says
AVAIO Digital Partners (Stamford, CT) signed a purchase agreement with the Appomattox County EDA for a 452-acre site (also cited as 442 acres) north of the town of Appomattox, accessible via US 460 and VA 26. The site is zoned for data-center use; construction is planned in phases through 2027-2028. Power via Central Virginia Electric Cooperative and Dominion Energy. Not previously tracked under any name.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
No status history was supplied in this edition.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Developer plans $3B data center in Appomattox County · Virginia Business
- Appomattox County answers questions for future data center · WDBJ7
- Avaio: Appomattox, VA Data Center · Baxtel
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID avaio-appomattox-va. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000112
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- 1098 Oakville Rd, Appomattox, VA (Approximate location)
Roles
- Operator: AVAIO Digital Partners
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported permitted
Provider status label; not a DataCenterData finding that the facility is operating.
- Announced: 10 December 2024
Provider-reported announcement date.
Area, acreage and buildings
- Land area: 452 acres (source-reported; parcel boundary not established)
Power capacity
- Reported capacity: Planned: 300 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
Permits, incentives, jobs and proceedings
- Announced investment: $3 billion
Announced figure; whether it covers one building, a campus or a multi-phase program is not established.
Sources, dates, limitations and corrections
- Provider update date: 2026-08-27
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Cooling, water, PUE and WUE · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.