This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.
Reported geography
Source-reported location for Atlas Compute AI Data Center Campus.
Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →
Source row snapshot
- Operator as published
- Atlas Compute (infrastructure by Penguin Solutions)
- Address and locality
- Post Office Road, Midway Industrial Park · Fort Pierce · St. Lucie County · Florida
- Official metro area
- Port St. Lucie, FL
- Source-reported status
- proposed
- Provider facility type
- data center
- Reported capacity
- Planned: 240 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
- Source freshness
- 14 September 2026
- Location precision
- approximate
- Compute Atlas confidence label
- confirmed (provider's classification; not a DataCenterData check)
- Stable directory ID
dcd-dir-000101
Reported details
Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.
- Power source
- On-site gas
- Cooling
- Air
Provider notes
Energy. Atlas Compute plans to build its own natural gas-fired power plant to serve the campus rather than draw the full load from the utility; the site borders FPUA's Treasure Coast Energy Center.
Water. Company release states the facility will feature "cooling technology to eliminate the need for water use" (WFLX, March 2026). No recirculating water circuit is described; if a later source identifies a closed water loop, this should be re-read as closed_loop.
What the source record says
Land and utilities secured. Targeting operational Q4 2026-Q1 2027. Up to 1 GW expansion capacity. Distinct from the withdrawn Sentinel Grove/Project Jarvis project in the same county.
Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.
Status history supplied by the source
- 2025-11-06 · source-reported proposed
Land and utilities secured for a 240 MW initial campus, with up to 1 GW expansion capacity.
Sources and attribution
These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.
- Atlas Compute secures land and utilities for 240 MW AI data center campus · GlobeNewswire
- Florida-based company announces plans to build AI data center in Fort Pierce · WFLX
- Massive AI Server Farm Sets Sights On Fort Pierce, Neighbors Want Answers
- TCPalm via Yahoo News — Atlas Compute's St. Lucie County campus would be powered by its own natural gas-fired power plant, on over 26 acres at Midway Industrial Park bordering the Treasure Coast Energy Center · TCPalm / Treasure Coast Newspapers
Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID atlas-compute-ai-data-center-campus-fort-pierce-fl. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).
Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.
That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.
Recorded information
What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.
Licensed directory listing dcd-dir-000101
Licensed directory row.
Provider notes and the source narrative are printed on this page and are not repeated here.
Identity and relationships
- Provider facility type: data center
Provider facility type.
Location and precision
- Post Office Road, Midway Industrial Park, Fort Pierce, FL · St. Lucie (Approximate location)
Roles
- Operator: Atlas Compute (infrastructure by Penguin Solutions)
Operator label as published by the provider; no parent company is inferred.
Lifecycle
- Source-stated status: source-reported proposed
Provider status label; not a DataCenterData finding that the facility is operating.
- Status history: 2025-11-06 · source-reported proposed
Status history supplied by the source.
Power capacity
- Reported capacity: Planned: 240 MW (source-reported; boundary not independently verified; MW measure not stated by provider)
Reproduced as the page prints it; not ranked or totaled; unknown is not zero.
- Power source: On-site gas
Provider label.
Cooling, water, PUE and WUE
- Cooling: Air
Provider label.
Sources, dates, limitations and corrections
- Provider update date: 2026-09-14
Provider update date is not a DataCenterData verification date.
Not yet recorded here: Area, acreage and buildings · Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact · Permits, incentives, jobs and proceedings.
Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.
Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.