California

Rate design rulemaking that includes data center rates

Regulatory or tariff proceeding

Pending proceeding This is an open proceeding, not a final rule or tariff approval.

In plain English

Who it would affect: The rulemaking names six electric utilities as respondents, including Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric. Neither the opening order nor the scoping memo gives a megawatt size for the data center customers any new rate would cover.

What it would change: The 22 September 2026 scoping memo, which sets the issues and schedule, makes data center tariffs and customer protections the first of four tracks. The Commission would consider a separate customer class, new rates, contract terms, refunds, exit fees, and protections against cost shifts and stranded costs.

Easy to misread: The proposed decision filed on 14 October 2026 in this rulemaking concerns consultant funding of up to $700,000, not a data center rate.

  • Staff proposal on a data center tariff: First quarter of 2027, on a schedule the judge may modify (Section 4, Track 1)
  • Proposed decision on data centers: Second quarter of 2027; an evidentiary hearing, if required, may delay it (Section 4, Track 1)
  • Commission decision: No sooner than 30 days after the proposed decision (Section 4, Track 1)
  • Evidentiary hearing on data center issues: May be needed; motions due 20 days after the staff proposal ruling (Section 3 and Section 4)
  • Senate Bill 57 report to the Legislature: On or before 1 January 2027, on the extent to which costs from new data center loads result in stranded costs and cost shifts (Order Instituting Rulemaking, Section 1.6)

Written from Assigned Commissioner’s Scoping Memo and Ruling, Rulemaking 26-04-009, 22 September 2026, read on 3 November 2026. A reading aid, not legal advice. The document controls.

Summary

The California Public Utilities Commission opened Rulemaking 26-04-009 on advanced electric rate design; the order was filed on 9 April 2026 and issued on 10 April 2026. Among other issues, the order says the proceeding will consider rate design issues for data centers and other large-load customers in coordination with the Senate Bill 57 cost-shift assessment. The order is procedural: it opens the proceeding and does not adopt a data center rate or tariff. A scoping memo of 22 September 2026 makes data center tariffs and customer protections the first of four tracks, with a staff proposal planned for the first quarter of 2027 and a proposed decision for the second quarter.

Scope

California Public Utilities Commission Rulemaking 26-04-009, an Order Instituting Rulemaking on California advanced electric rate design filed 9 April 2026, says that in coordination with the Senate Bill 57 assessment the proceeding will consider rate design issues for data centers and other large load customers. The order opens the proceeding; it adopts no data center rate.

Geographic scope
California
Jurisdiction
State
Authority type
Regulator or commission
Issuing authority
California Public Utilities Commission

Dates

Adopted
No adoption day is recorded
Effective
Effective date not stated in the source
Scheduled expiration
No expiration date recorded
Ended
Not recorded as ended
Completion condition
None stated
Source document
10 April 2026
Last checked
3 November 2026
About this date

This record was last checked before the tracker date, 16 November 2026. An earlier check date does not by itself mean the record's status has changed.

Proceeding
R.26-04-009

What this does not establish

  • The Commission docket card was not opened. The official document index was read on 3 November 2026. It lists the 22 September 2026 scoping memo and a proposed decision filed on 14 October 2026, both read here; two filed email rulings were read only to their headers.
  • The proceeding link is the order itself because the docket card could not be opened.
  • Data centers are one of several issues in the rulemaking; this record covers only that data center issue. The scoping memo places other large-load customers in a separate track.

Unresolved questions

  • What rate, contract terms or customer protections the Commission will adopt for data centers, if any.

Relationships

Supersession means a later instrument replaces the earlier legal effect. Repeal links identify the repeal instrument and the measure it ends. A later implementation or related letter is not treated as a replacement unless the record says so.

  • No related action is recorded.

Sources

Primary source: California Public Utilities Commission page on docs.cpuc.ca.gov

Back to the policy tracker · California policy module