Licensed lead · not independently verified · dcd-dir-001556

Energy Generation and Technology Campus

source-reported proposed

W Holdings

Maricopa · Pinal County · Arizona

Capacity not statedSource updated 28 August 2026approximate location · provider confidence label: confirmed
How to read this page

This is a source-attributed discovery row. It can help you find a place and its citations; it is not a DataCenterData finding that the facility is distinct or currently operating.

Reported geography

Source-reported location for Energy Generation and Technology Campus.

Approximate source coordinates; this is not a parcel claim. Nearby source points are combined into one accessible target that opens this exact map scope. View these exact rows on the interactive map →

Exact source coordinates Approximate or representative coordinates Nearby-point group. This relative plot uses only source-supplied points, makes no parcel claim and loads no map tiles.

Source row snapshot

Operator as published
W Holdings
Address and locality
Maricopa · Pinal County · Arizona
Official metro area
Phoenix-Mesa-Chandler, AZ
Source-reported status
proposed
Provider facility type
data center
Reported capacity
Not stated
Source freshness
28 August 2026
Location precision
approximate
Compute Atlas confidence label
confirmed (provider's classification; not a DataCenterData check)
Stable directory ID
dcd-dir-001556

Reported details

Source-reported by Compute Atlas; not independently verified by DataCenterData. Provider wording is kept; long provider notes are shortened and marked …; unknown is not zero; none of these values is totaled, ranked or compared.

Power source
MixedProvider label.
Cooling
Not establishedThe provider reports water information but no cooling type.
Land area
495 acres (source-reported; parcel boundary not established)
Announced investment
$9.5 billionAnnounced figure; whether it covers one building, a campus or a multi-phase program is not established.
Announced jobs
500 permanentAnnounced figures; whether they cover one building, a campus or a multi-phase program is not established. Open cited source →
Community response
Provider label: opposedCompute Atlas characterization, not a DataCenterData assessment. Open cited source →
Announced
16 October 2025Provider-reported announcement date.

Provider notes

Energy. Plan pairs data centers with an on-site natural gas power plant and battery energy storage. The applicant told the commission the campus would be powered primarily by the Griffin Energy Project (solar, gas and battery). No MW figure has been stated publicly.

Water. Applicant projects roughly 500 acre-feet of water use annually. Cooling method not stated.

Community. The Ak-Chin Indian Community, whose southern boundary abuts the site, opposes the location. Vice-chairwoman Delia Carlyle cited a high concentration of cultural artifacts and concern that ground disturbance would affect ancestral remains, while saying the community does not oppose development generally.

What the source record says

Located south of the City of Maricopa, east of State Route 347 and west of the Nissan test track, abutting the southern boundary of the Ak-Chin Indian Community. Investment is recorded as the itemized $4B construction plus $5.5B equipment figure presented to the Planning and Zoning Commission; a separate report rounds the total to $10B. Acreage is also reported as 500 and, in one account, 656 acres. Some coverage associates the site with Copia Power; the applicant of record in commission and board coverage is W Holdings, represented by the same attorney who has appeared for Copia projects, so the corporate relationship is not established here.

Capacity is not ranked or totaled here.

Any MW value is reproduced as source-reported context. Its measurement boundary is not established consistently enough for comparison. Unknown is not zero.

Status history supplied by the source

  1. 2025-11-20 · source-reported proposed

    Pinal County Board of Supervisors unanimously approved the major comprehensive plan land-use amendment; rezoning still required.

    Open cited source →

Sources and attribution

These sources are listed for the whole row. Unless a figure links to its own source, the provider does not mark which one gave it, so a figure may not appear in every source.

Adapted from Compute Atlas by Edward Kubiak, edition 1.34.1, under CC BY 4.0. Upstream ID w-holdings-energy-generation-technology-campus-maricopa-az. Filtered to data-center records in the 50 U.S. states; selected fields normalized for search and display; DataCenterData directory IDs added. Some locations in this layer are reported by the provider as derived from OpenStreetMap (© OpenStreetMap contributors, ODbL, https://www.openstreetmap.org/copyright) and Epoch AI (CC BY 4.0).

Compute Atlas 1.34.1 with retained prior rows and publication holds. This is a DataCenterData composite, not an unmodified publisher edition. This row uses the captured source from 1.34.1, source as of 2026-10-14T20:40:52.293Z.

No reviewed record is linked to this row yet.

That does not mean the row is wrong, and it does not mean no reviewed record exists for the same place. A link is added only when an identifier or source establishes the match.

Recorded information

What this page records, grouped by topic, with the source's units and qualifications. Company-reported values stay labeled as company-reported. Related listings are shown separately.

Licensed directory listing dcd-dir-001556

Licensed directory row. Licensed directory label. Source-reported and not independently verified.

Provider notes and the source narrative are printed on this page and are not repeated here.

Identity and relationships

  • Provider facility type: data center

    Provider facility type.

Location and precision

  • Maricopa, AZ · Pinal (Approximate location)

Roles

  • Operator: W Holdings

    Operator label as published by the provider; no parent company is inferred.

Lifecycle

  • Source-stated status: source-reported proposed

    Provider status label; not a DataCenterData finding that the facility is operating.

  • Announced: 16 October 2025

    Provider-reported announcement date.

  • Status history: 2025-11-20 · source-reported proposed

    Status history supplied by the source.

Area, acreage and buildings

  • Land area: 495 acres (source-reported; parcel boundary not established)

Power capacity

  • Reported capacity: Not stated

    Reproduced as the page prints it; not ranked or totaled; unknown is not zero.

  • Power source: Mixed

    Provider label.

Cooling, water, PUE and WUE

  • Cooling: Not established

    The provider reports water information but no cooling type.

Permits, incentives, jobs and proceedings

  • Announced investment: $9.5 billion

    Announced figure; whether it covers one building, a campus or a multi-phase program is not established.

  • Announced jobs: 500 permanent

    Announced figures; whether they cover one building, a campus or a multi-phase program is not established.

  • Community response: Provider label: opposed

    Compute Atlas characterization, not a DataCenterData assessment.

Sources, dates, limitations and corrections

  • Provider update date: 2026-08-28

    Provider update date is not a DataCenterData verification date.

Not yet recorded here: Connectivity · Services · Certifications and design ratings · Rack density · Availability · Specification links and contact.

Licensed values: adapted from Compute Atlas by Edward Kubiak under CC BY 4.0. Source-reported and not independently verified.

Update this profile with a public source. The request includes topics needing more information; this does not mean the facility lacks them. Corrections and additions are reviewed before publication.

Corrections

Report an error in this row →